BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)
Pakistan

LCCI stresses Kalabagh Dam construction

Published Updated

imageLAHORE: Lahore Chamber of Commerce and Industry (LCCI) on Monday advocated an early construction of Kalabagh Dam saying that this dam was crucial to cope with the challenges energy shortage, food security, famine and floods.

LCCI President Sheikh Muhammad Arshad, Senior Vice President Almas Hyder and Vice President Nasir Saeed told the media here that in the absence of a mega dam, the country was suffering from a loss of Rs 132 billion annually.

They added that according to experts, there was no threat to Nowshehra city as it was 150 feet above the water level, asserting that historical data indicated that during past 75 years average 146 million acres of water was available per year in River Indus.

The LCCI office-bearers said that all stakeholders should show maturity on the issue, citing that unlike Pakistan, India was constructing dams at every possible site and had left us decades behind.

They said that everyone knows that the existing dams are constantly silting up leaving ever-decreasing capacity to store water.

The construction of the KBD along with other new dams was desperately needed to store adequate water. According to a conservative estimate about 30 million acres feet of water was being wasted into the sea because the country had no big water reservoirs to store it.

More importantly, as a result of melting of glaciers due to global warming, a sword of Damocles remains hanging over our heads in the shape of floods.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.