AIRLINK 73.06 Decreased By ▼ -6.94 (-8.68%)
BOP 5.09 Decreased By ▼ -0.09 (-1.74%)
CNERGY 4.37 Decreased By ▼ -0.09 (-2.02%)
DFML 32.45 Decreased By ▼ -2.71 (-7.71%)
DGKC 75.49 Decreased By ▼ -1.39 (-1.81%)
FCCL 19.52 Decreased By ▼ -0.46 (-2.3%)
FFBL 36.15 Increased By ▲ 0.55 (1.54%)
FFL 9.22 Decreased By ▼ -0.31 (-3.25%)
GGL 9.85 Decreased By ▼ -0.31 (-3.05%)
HBL 116.70 Decreased By ▼ -0.30 (-0.26%)
HUBC 132.69 Increased By ▲ 0.19 (0.14%)
HUMNL 7.10 Increased By ▲ 0.04 (0.57%)
KEL 4.41 Decreased By ▼ -0.24 (-5.16%)
KOSM 4.40 Decreased By ▼ -0.25 (-5.38%)
MLCF 36.20 Decreased By ▼ -1.30 (-3.47%)
OGDC 133.50 Decreased By ▼ -0.97 (-0.72%)
PAEL 22.60 Decreased By ▼ -0.30 (-1.31%)
PIAA 26.01 Decreased By ▼ -0.62 (-2.33%)
PIBTL 6.55 Decreased By ▼ -0.26 (-3.82%)
PPL 115.31 Increased By ▲ 3.21 (2.86%)
PRL 26.63 Decreased By ▼ -0.57 (-2.1%)
PTC 14.10 Decreased By ▼ -0.28 (-1.95%)
SEARL 53.45 Decreased By ▼ -2.94 (-5.21%)
SNGP 67.25 Increased By ▲ 0.25 (0.37%)
SSGC 10.70 Decreased By ▼ -0.13 (-1.2%)
TELE 8.42 Decreased By ▼ -0.87 (-9.36%)
TPLP 10.75 Decreased By ▼ -0.43 (-3.85%)
TRG 63.87 Decreased By ▼ -5.13 (-7.43%)
UNITY 25.12 Decreased By ▼ -0.37 (-1.45%)
WTL 1.27 Decreased By ▼ -0.05 (-3.79%)
BR100 7,465 Decreased By -57.3 (-0.76%)
BR30 24,199 Decreased By -203.3 (-0.83%)
KSE100 71,103 Decreased By -592.5 (-0.83%)
KSE30 23,395 Decreased By -147.4 (-0.63%)

ISLAMABAD: Pakistan Railways has rehabilitated and reconstructed around 230 bridges across the country to ensure smooth trains operation besides reducing the travel duration.

“Around 86 percent of railways bridges are more than 100 years old but all bridges are safe for train operation due to effective maintenance owing to regular maintenance, rehabilitation and strengthening of these bridges,” an official in the Ministry of Railways told APP.

He said there are 13,959 major and minor bridges over the system and the design life of which varies for different years.

The Standard Operating Procedure for inspection of bridges in accordance with the different schedules like monthly, quarterly, biannually and annually. The official said average 77.10 percent of track is over-aged and minor repair are carried out departmentally in routine to ensure safety of the passengers.

However, he said 730 kilometers track has been rehabilitated or partially rehabilitated through complete track renewal, sleeper renewal and rail renewal under different PSDP projects.

To a question, the official said Pakistan Railways has finalized a plan to upgrade its track from Karachi-Peshawar via Lahore in the next five years under China Pakistan Economic Corridor project.

He said Pakistan Railways track from Lahore - Peshawar via Rawalpindi will be dialyzes in the next five years.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.