AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,941 Increased By 103.5 (1.32%)
BR30 25,648 Increased By 196 (0.77%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

power-transmissionMUZAFFARGARH: Oil supply to power plants in the country has been increased to 25‚000 metric tonnes from 12‚000 metric tonnes to operate them at maximum capacity and no plant running on fuel is closed due to oil shortage, Federal Information Minister Qamar Zaman Kaira said on Monday.

Talking to newsmen along with Water & Power Minister Ch. Ahmad Mukhtar in Muzaffargarh‚ he said windstorm damaged 500KV and 220KV main electricity lines few days back in Muzaffargarh‚ causing loss of 1800MW. He said two lines have been restored which added 1100MW electricity to national grid. By Monday evening‚ 350MW Lal Peer plant will also be restored.
Kaira said the two 325MW each power plants of Chashma have also resumed production due to which generation capacity has improved and stabilized.

He said the government has initiated short, medium and long term measures in order to overcome electricity crisis in the country.
He asked Punjab Chief Minister to avoid politics on issue of load shedding and said under the 18th Constitution amendment‚ the provinces are empowered to generate electricity on their own.

Copyright PPI (Pakistan Press International), 2012

Comments

Comments are closed.