AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,943 Increased By 105.5 (1.35%)
BR30 25,639 Increased By 187.1 (0.73%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

electric power 400ISLAMABAD: Adviser to Prime Minister on Petroleum and Natural Resources Dr. Asim Hussain on Tuesday said all available resources were being made to overcome energy crises.

Talking to Pakistan Television (PTV), he said in the last meeting on Saturday, Prime Minister Raja Pervaiz Ashraf had advised to provide 28000 metric ton furnace oil for electricity generation.

Dr. Asim said supply of furnace oil was being ensured on PM's directives and provision of funds was the responsibility of the Finance Ministry.

He said the generation capacity had improved upto 12,600 MW from 9,000 MW and hoped that the generation capacity would rise upto 14,000 MW in coming days.

The power generation capacity could be increased up to 16,000 MW by increasing oil supply, he added.

The petroleum prices should be reviewed after 7 days instead of 14 days, the minister also said.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed.