AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)
Pakistan Print 2020-02-17

PDMA reconstructs 30 flood-damaged schools

The Provincial Disaster Management Authority (PDMA) has reconstructed and handed over 30 flood affected schools to Education Department KP while work on 80 other damaged schools is in progress across the province.
Published February 17, 2020

The Provincial Disaster Management Authority (PDMA) has reconstructed and handed over 30 flood affected schools to Education Department KP while work on 80 other damaged schools is in progress across the province.

PDMA has reconstructed 18 schools in Malakand Division including six in Swat district, four Lower Dir, five Upper Dir, two Malakand and one in Shangla; while 12 schools in the other district's including seven in Nowshera, Charsadda three and two have been completed in DI Khan.

The spokesperson on Sunday said that five schools in Dir Upper have been completed while six other schools would be completed soon in the district. New schools are equipped with good facilities as required for an institution i.e. boundary walls, furniture, power supply and best designed buildings. The newly reconstructed buildings would provide best learning opportunities and have been welcomed by the community members as these schools have been reconstructed in shot spam of time.

At the end of 2017, PDMA had been assigned the reconstruction of these schools with financial support of international donor Agency, USAID. Head Teacher of the GPS Nehag Dara, Sheer Ahmad, said that the school was handed over to them and they resumed classes at the new building.

He further said that around 360 students including boys and girls are getting education in the newly built model school. "Students of private schools have also enrolled at the school as it has much space to accommodate more students and better environment," he added.

Zubair Khan, a class-IV student, said that he was excited to study at the newly built school as it was hard to get education at tents. This building has all the basic amenities "It was my dream to study in proper building. I am glad that the school building was reconstructed and has improved education facilities," he added.

Copyright Business Recorder, 2020

Comments

Comments are closed.