AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)

As the water-flows increase with rising temperature in the catchment area, Golen Gol Hydropower Project on Wednesday attained its maximum generation capacity of 108MW. Golen Gol Hydropower Project went into operation with commissioning of its first unit in January 2018 followed by completion of its second and third units in a phased manner by mid 2018.
For evacuation of electricity from Golen Gol Hydropower Project to the national grid, Wapda also successfully completed the most difficult transmission line from Golen Gol (Chitral) to Timergara in September last year. The 180-kilometer long Golen Gol-Timergara transmission line crosses through the most difficult mountainous terrain having extreme weather conditions.
As many as 706 transmission towers including 141 towers of 132 Kilovolt (KV) and 565 towers of 220 KV have been erected on the snow-clad mountain peaks including that of Lowari Top at the highest altitude of 10312 feet. The transmission towers in Pakistan have never been erected earlier at this altitude.
Golen Gol Hydropower Project has been constructed on Golen Gol - a tributary of River Mastuj - near Chitral. The installed generation capacity of the project is 108MW with three generating units, each of them having a generation capacity of 36MW.

Copyright Business Recorder, 2019

Comments

Comments are closed.