AIRLINK 74.50 Increased By ▲ 0.21 (0.28%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.42 Increased By ▲ 0.05 (1.14%)
DFML 39.50 Increased By ▲ 0.70 (1.8%)
DGKC 85.19 Increased By ▲ 0.37 (0.44%)
FCCL 21.15 Decreased By ▼ -0.06 (-0.28%)
FFBL 34.00 Decreased By ▼ -0.12 (-0.35%)
FFL 9.70 No Change ▼ 0.00 (0%)
GGL 10.50 Increased By ▲ 0.08 (0.77%)
HBL 112.50 Decreased By ▼ -0.50 (-0.44%)
HUBC 136.67 Increased By ▲ 0.47 (0.35%)
HUMNL 12.21 Increased By ▲ 0.31 (2.61%)
KEL 4.76 Increased By ▲ 0.05 (1.06%)
KOSM 4.50 Increased By ▲ 0.06 (1.35%)
MLCF 37.82 Increased By ▲ 0.17 (0.45%)
OGDC 136.12 Decreased By ▼ -0.08 (-0.06%)
PAEL 25.25 Increased By ▲ 0.15 (0.6%)
PIAA 19.81 Increased By ▲ 0.57 (2.96%)
PIBTL 6.70 Decreased By ▼ -0.01 (-0.15%)
PPL 121.94 Decreased By ▼ -0.16 (-0.13%)
PRL 26.78 Increased By ▲ 0.13 (0.49%)
PTC 13.89 Decreased By ▼ -0.04 (-0.29%)
SEARL 57.25 Increased By ▲ 0.03 (0.05%)
SNGP 67.21 Decreased By ▼ -0.39 (-0.58%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.37 Decreased By ▼ -0.03 (-0.36%)
TPLP 11.20 Increased By ▲ 0.07 (0.63%)
TRG 63.30 Increased By ▲ 0.49 (0.78%)
UNITY 26.61 Increased By ▲ 0.11 (0.42%)
WTL 1.37 Increased By ▲ 0.02 (1.48%)
BR100 7,810 Decreased By -0.5 (-0.01%)
BR30 25,169 Increased By 19.1 (0.08%)
KSE100 74,974 Increased By 17 (0.02%)
KSE30 24,072 Decreased By -11.4 (-0.05%)

The Khyber Pakhtunkhwa (KP) Relief and Rehabilitation Department has released development funds for the reconstruction of health, education and drinking water facilities in seven tribal districts. For Orakzai district, a fund of Rs 1.043 billion has been released out of which Rs 594.5 million have been released for the reconstruction of 36 schools. A total of 13 health facilities will be reconstructed for which Rs 280.5 million have been allocated. A total of 24 drinking water supply schemes will be started for which Rs 168.3 million have been allocated, said an official notification issued here.
For South Waziristan, a total of Rs 1.013 billion developmental funds has been released for 45 schools' reconstruction at the cost of Rs 245.7 million while 10 health centres will be constructed for which Rs 74.3 million has been allocated. It was added that a total of 190 drinking water supply schemes will be initiated for which Rs 464.3 million has been kept aside.
Rs 1.059 billion have been released for North Waziristan where 69 schools will be rehabilitated at the cost of Rs 346.5 million. Seventeen health facilities will be reconstructed for which Rs 110.1 million has been allocated. While for 32 drinking water supply schemes, a fund of Rs 297.6 million has been released. Besides this, 11 irrigation schemes will also be carried out at the cost of Rs 305.5 million.
Rupees 333 million was released for Bajaur where 22 schools will be reconstructed at the cost of Rs 171 million, while 10 health facilities will be rehabilitated at Rs 44.6 million. Reconstruction of 20 drinking water supply schemes will also be completed at the cost of Rs 117 million.
For Kurram district, Rs 1.105 billion was released for the reconstruction of 41 schools, 13 health facilities. Rs 495.3 million has been released for the reconstruction of 12 schools, 7 health facilities and 8 drinking water schemes in Mohmand District. For districts KP Rs 422.5 million released for the reconstruction of 14 schools, 1 health facility and 25 drinking water supply schemes.

Copyright Business Recorder, 2019

Comments

Comments are closed.