BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.06%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.81 Decreased By ▼ -0.17 (-0.31%)
BOP 33.13 Increased By ▲ 0.15 (0.45%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.14 Increased By ▲ 0.01 (0.19%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.86 Increased By ▲ 0.32 (5.78%)
LOTCHEM 27.17 Decreased By ▼ -1.95 (-6.7%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.70 Increased By ▲ 0.68 (1.24%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.78 Increased By ▲ 1.83 (0.59%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.25 Increased By ▲ 0.26 (0.63%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 213.83 Increased By ▲ 1.17 (0.55%)
PRL 54.15 Increased By ▲ 1.61 (3.06%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.16 Increased By ▲ 0.06 (0.24%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.41 Decreased By ▼ -0.33 (-1.52%)
TRG 59.98 Increased By ▲ 3.09 (5.43%)

BAHAWALPUR: Sui Northern Gas Pipeline Limited (SNGPL) Regional Manager Malik Bashir Ahmed Tuesday said long term steps are being taken to improve gas pressure across Bahawalpur division.

Talking to reporters, he said a project is underway to replace a 11-inch pipeline from Khairpur Daha to Bahawalpur with 16-inch.

A huge amount would be spent on the 49-kilometre pipeline project and complaints of low pressure during the winter season would also be addressed, he added.

He said Ahmedpur Road Chowk Bhatta No1 to Model Town B, Model Town C to General Bus Stand 4-inch wide pipeline will be replaced with 8-inch line. On the replacing of the 4.5 kilometre long pipeline, around Rs80 million will be spent, he said.

With the change of the line, Shahdra, Kausar Colony, Model Town B, Model Town C and its adjoining areas will have sufficient pressure of gas, he said.

He said current pipeline with 4-inch of width was not enough for the needs, he said and added the project would start from December this year.

He said the process of changing the pipelines throughout the city was in progress. He said it would reduce the line losses and rectify the complaints of low pressure.

He said replacing of pipelines in Model Town B had been completed. He further said bribe and intercession culture in SNGPL matters had been finished and now every task is being done on merit.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.