BR100 Increased By (1.21%)
BR30 Increased By (1.65%)
KSE100 Increased By (1.15%)
KSE30 Increased By (1.12%)
BECO 5.66 Increased By ▲ 0.08 (1.43%)
BML 62.19 Increased By ▲ 0.97 (1.58%)
BOP 34.66 Increased By ▲ 0.98 (2.91%)
CNERGY 8.17 Increased By ▲ 0.09 (1.11%)
DCL 12.02 Increased By ▲ 0.38 (3.26%)
FCCL 53.73 Increased By ▲ 1.59 (3.05%)
FCSC 5.70 Increased By ▲ 0.07 (1.24%)
FFL 18.17 Increased By ▲ 0.16 (0.89%)
FNEL 1.36 Increased By ▲ 0.01 (0.74%)
HUMNL 11.23 Increased By ▲ 0.19 (1.72%)
KEL 7.98 Increased By ▲ 0.14 (1.79%)
KOSM 6.11 Increased By ▲ 0.38 (6.63%)
MLCF 89.16 Increased By ▲ 2.65 (3.06%)
NBP 186.81 Increased By ▲ 2.51 (1.36%)
PACE 11.80 Increased By ▲ 0.15 (1.29%)
PAEL 41.10 Increased By ▲ 1.14 (2.85%)
PIAHCLA 26.14 Increased By ▲ 0.47 (1.83%)
PIBTL 17.54 Increased By ▲ 0.27 (1.56%)
PPL 225.80 Increased By ▲ 3.13 (1.41%)
PRL 34.67 Increased By ▲ 0.21 (0.61%)
PTC 64.85 Increased By ▲ 1.11 (1.74%)
SEARL 91.39 Increased By ▲ 0.93 (1.03%)
SSGC 27.04 Increased By ▲ 0.37 (1.39%)
TELE 9.09 Increased By ▲ 0.18 (2.02%)
THCCL 69.34 Increased By ▲ 0.87 (1.27%)
TPLP 11.36 Increased By ▲ 0.16 (1.43%)
TREET 24.81 Increased By ▲ 0.11 (0.45%)
TRG 70.72 Increased By ▲ 0.13 (0.18%)
WAVES 11.46 Increased By ▲ 0.35 (3.15%)
WTL 1.29 Increased By ▲ 0.02 (1.57%)

DCO Salman Ghani directed for accelerating the construction work of Parking Plaza for its early completion. He inspected the pace of construction work of Parking Plaza which is being established outside Chiniot Bazar to facilitate the citizens for the parking of their vehicles near eight bazaars of Clock Tower. DO Building Tahir Anjum gave briefing about the latest construction work and its specification. DCO said that the mega project of parking plaza was very important to resolve the chronic issue of vehicle parking in the city areas.

Copyright Business Recorder, 2016

Comments

Comments are closed for this article.