AIRLINK 75.41 Increased By ▲ 0.56 (0.75%)
BOP 5.00 Increased By ▲ 0.02 (0.4%)
CNERGY 4.52 Increased By ▲ 0.03 (0.67%)
DFML 42.09 Increased By ▲ 2.09 (5.23%)
DGKC 87.33 Increased By ▲ 0.98 (1.13%)
FCCL 21.62 Increased By ▲ 0.26 (1.22%)
FFBL 34.00 Increased By ▲ 0.15 (0.44%)
FFL 9.82 Increased By ▲ 0.10 (1.03%)
GGL 10.55 Increased By ▲ 0.10 (0.96%)
HBL 114.31 Increased By ▲ 1.57 (1.39%)
HUBC 138.80 Increased By ▲ 1.36 (0.99%)
HUMNL 12.01 Increased By ▲ 0.59 (5.17%)
KEL 5.20 Decreased By ▼ -0.08 (-1.52%)
KOSM 4.70 Increased By ▲ 0.07 (1.51%)
MLCF 38.03 Increased By ▲ 0.23 (0.61%)
OGDC 140.05 Increased By ▲ 0.55 (0.39%)
PAEL 26.24 Increased By ▲ 0.63 (2.46%)
PIAA 21.95 Increased By ▲ 1.27 (6.14%)
PIBTL 6.87 Increased By ▲ 0.07 (1.03%)
PPL 124.25 Increased By ▲ 2.05 (1.68%)
PRL 27.08 Increased By ▲ 0.50 (1.88%)
PTC 14.02 Decreased By ▼ -0.03 (-0.21%)
SEARL 59.29 Increased By ▲ 0.31 (0.53%)
SNGP 68.80 Decreased By ▼ -0.15 (-0.22%)
SSGC 10.40 Increased By ▲ 0.10 (0.97%)
TELE 8.43 Increased By ▲ 0.05 (0.6%)
TPLP 11.29 Increased By ▲ 0.23 (2.08%)
TRG 64.40 Increased By ▲ 0.21 (0.33%)
UNITY 26.63 Increased By ▲ 0.08 (0.3%)
WTL 1.49 Increased By ▲ 0.04 (2.76%)
BR100 7,915 Increased By 77.5 (0.99%)
BR30 25,712 Increased By 260.3 (1.02%)
KSE100 75,659 Increased By 544.8 (0.73%)
KSE30 24,300 Increased By 186.4 (0.77%)
Top News

PM Abbasi calls meeting over load-shedding crisis in Karachi

Taking notice of the load shedding crisis in Karachi, Prime Minister Shahid Khaqan Abbasi has called a meeting of Ca
Published April 21, 2018

Taking notice of the load shedding crisis in Karachi, Prime Minister Shahid Khaqan Abbasi has called a meeting of Cabinet Committee on Energy on April 23.

According to local media reports, the meeting will be held in Karachi. As the month of Ramazan approaches, the citizens are facing a lot of hardships as load-shedding continues to prevail in Karachi.

Earlier on Friday, political parties, including Pak Sarzameen Party and Jamaat-e-Islami, staged a protest outside Karachi Press Club and K-Electric (KE) head office near Punjab Chowrangi.

On Thursday, the National Electric Power Regulatory Authority hinted at taking over KE and said that it had the authority to take over if the load-shedding issue was not solved immediately.

The KE issued a press release blaming the cause of prolonged load-shedding to low gas supply from Sui Southern Gas Company (SSGC). The release stated that KE is currently receiving gas supply at approximately 90mmcfd as opposed to Economic Coordination Committee (ECC) allocated 276mmcfd and below the supply levels of this time last year.

SSGC immediately replied to their claim terming the statement misleading.

Copyright Business Recorder, 2018

Comments

Comments are closed.