BR100 Increased By (0.44%)
BR30 Increased By (1.39%)
KSE100 Increased By (0.62%)
KSE30 Increased By (0.61%)
BECO 5.43 Decreased By ▼ -0.06 (-1.09%)
BML 55.69 Decreased By ▼ -1.07 (-1.89%)
BOP 35.38 Increased By ▲ 0.26 (0.74%)
CNERGY 8.20 Increased By ▲ 0.05 (0.61%)
DCL 11.55 Increased By ▲ 0.04 (0.35%)
FCCL 58.36 Increased By ▲ 1.61 (2.84%)
FCSC 5.12 Decreased By ▼ -0.03 (-0.58%)
FFL 17.84 Decreased By ▼ -0.04 (-0.22%)
FNEL 1.25 No Change ▼ 0.00 (0%)
HUMNL 11.07 Decreased By ▼ -0.05 (-0.45%)
KEL 8.75 Increased By ▲ 0.33 (3.92%)
KOSM 6.69 Increased By ▲ 0.11 (1.67%)
MLCF 107.15 Increased By ▲ 3.85 (3.73%)
NBP 201.73 Increased By ▲ 1.55 (0.77%)
PACE 11.30 Increased By ▲ 0.01 (0.09%)
PAEL 44.49 Increased By ▲ 1.02 (2.35%)
PIAHCLA 29.41 Increased By ▲ 1.92 (6.98%)
PIBTL 18.64 Increased By ▲ 0.94 (5.31%)
PPL 247.98 Increased By ▲ 3.66 (1.5%)
PRL 35.29 Decreased By ▼ -0.14 (-0.4%)
PTC 66.14 Increased By ▲ 0.79 (1.21%)
SEARL 95.49 Increased By ▲ 2.17 (2.33%)
SSGC 32.04 Decreased By ▼ -0.90 (-2.73%)
TELE 8.87 Decreased By ▼ -0.04 (-0.45%)
THCCL 66.61 Decreased By ▼ -0.11 (-0.16%)
TPLP 10.57 Decreased By ▼ -0.26 (-2.4%)
TREET 25.30 Increased By ▲ 0.18 (0.72%)
TRG 64.40 Decreased By ▼ -0.50 (-0.77%)
WAVES 10.90 Decreased By ▼ -0.03 (-0.27%)
WTL 1.26 Increased By ▲ 0.01 (0.8%)

KARACHI: CEO of Karachi Water and Sewerage Corporation (KW&SC) Ahmed Ali Siddiqui, visited the University of Karachi and inspected the damaged water supply line.

On this occasion, Chief Engineer WTM, Zafar Palijo, gave the CEO KW&SC a detailed briefing regarding the ongoing repair work.

According to the Spokesperson of the KW&SC, the CEO KW&SC reviewed the speed, quality, and necessary facilities related to the repair work and instructed the concerned officers to ensure that the work is completed within the stipulated time so that the water supply from the University of Karachi line can be restored.

He clearly stated that no delay in the repair work will be tolerated and that the process will be closely monitored to ensure that water supply is restored to citizens as soon as possible.

On the occasion, the Chief Engineer WTM assured the CEO KW&SC that the repair work will be completed on time and the restoration of water supply will be ensured.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.