BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)
By

SINGAPORE: Sinopec Corp said on Monday that the company and Saudi Aramco have started constructing a refinery and petrochemical complex in southeast China’s Fujian province.

The new venture includes a 16 million metric ton-per-year (tpy), or 320,000 barrels per day refinery, a 1.5 million tpy ethylene plant, a 2 million paraxylene facility as well as a 300,000 tonnage crude oil terminal, Sinopec said in a statement.

Fujian Petrochemical - a joint venture between Sinopec and the Fujian government - will hold a 50% stake in the venture, and Saudi Aramco and Sinopec will each own 25%, Sinopec said.

Sinopec starts up ethylene complex in north China’s Tianjin

The project is slated to become operational in 2030, and once in production, it will be able to supply 5 million tons of petrochemical feedstocks annually.

Sinopec did not provide details on the investment value of the project.

Sinopec and Aramco signed a preliminary agreement to build the complex two years ago.

Comments

Comments are closed for this article.