BR100 Increased By (0.05%)
BR30 Decreased By (-0.02%)
KSE100 Increased By (0.24%)
KSE30 Increased By (0.29%)
BECO 5.77 Increased By ▲ 0.46 (8.66%)
BML 53.00 Increased By ▲ 1.42 (2.75%)
BOP 33.99 Increased By ▲ 0.03 (0.09%)
CNERGY 8.11 Decreased By ▼ -0.20 (-2.41%)
DCL 12.20 Increased By ▲ 0.40 (3.39%)
FCCL 52.83 Decreased By ▼ -0.17 (-0.32%)
FCSC 5.07 Increased By ▲ 0.12 (2.42%)
FFL 17.95 Decreased By ▼ -0.20 (-1.1%)
FNEL 1.29 Decreased By ▼ -0.03 (-2.27%)
HUMNL 10.88 Decreased By ▼ -0.12 (-1.09%)
KEL 8.02 Decreased By ▼ -0.12 (-1.47%)
KOSM 5.52 Decreased By ▼ -0.06 (-1.08%)
MLCF 86.51 Decreased By ▼ -1.37 (-1.56%)
NBP 185.16 Decreased By ▼ -2.53 (-1.35%)
PACE 10.58 Decreased By ▼ -0.23 (-2.13%)
PAEL 39.42 Decreased By ▼ -0.65 (-1.62%)
PIAHCLA 26.22 Decreased By ▼ -0.27 (-1.02%)
PIBTL 16.67 Decreased By ▼ -0.09 (-0.54%)
PPL 228.18 Decreased By ▼ -2.19 (-0.95%)
PRL 34.68 Decreased By ▼ -0.36 (-1.03%)
PTC 65.33 Increased By ▲ 0.82 (1.27%)
SEARL 90.13 Increased By ▲ 0.25 (0.28%)
SSGC 26.60 Decreased By ▼ -0.37 (-1.37%)
TELE 8.28 Decreased By ▼ -0.09 (-1.08%)
THCCL 58.50 Decreased By ▼ -0.58 (-0.98%)
TPLP 8.22 Increased By ▲ 0.04 (0.49%)
TREET 24.53 Decreased By ▼ -0.47 (-1.88%)
TRG 69.71 Decreased By ▼ -0.92 (-1.3%)
WAVES 9.94 Decreased By ▼ -0.07 (-0.7%)
WTL 1.28 Decreased By ▼ -0.01 (-0.78%)

LAHORE: The National Transmission and Despatch Company Limited (NTDC) has successfully added a 250 MVA autotransformer at 500 kV Grid Station Sheikhupura to enhance its power transmission capacity.

The augmentation work of existing 160 MVA, 220/132 kV autotransformer (T-8) with 250 MVA, 220/132 kV autotransformer has been completed by Project Delivery (North) Lahore, the autotransformer successfully energized, today.

A shutdown was approved up to 14-08-2024 for this work, however, NTDC team completed the project 03-days before the scheduled shutdown period by deploying extra resources.

The augmentation of this autotransformer will enhance the loading capacity of 500 kV Grid Station Sheikhupura and provide relief to the areas under Lahore Electric Supply Company (LESCO).

The enhanced capacity of this grid station will ensure smooth power supply, which will benefit the domestic, commercial and industrial consumers.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.