BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

ISLAMABAD: The National Highways Authority (NHA) Executive Board recommended the PC-I (Land Acquisition) of China–Pakistan Economic Corridor (CPEC) KKH Phase-II (Thakot to Raikot) at a cost of Rs4.133 billion for approval of Executive Committee of National Economic Council (ECNEC).

Official documents revealed that Arshad Majeed Mohmand, chairman NHA presided over the meeting which deliberated on PC-I (Land Acquisition) CPEC KKH Phase-II (Thakot to Raikot) with a total length of 241km. The board recommended the PC-1 for approval of the ECNEC.

The NHA Executive Board recommended the “PC-I for Construction of Motorway from Ghulam Khan to Esa Khel (165.410 km)” at a cost of Rs117.469 billion for approval of Central Development Working Party (CDWP)/ ECNEC.

The NHA Executive Board also recommended the “PC-I Construction Quetta–Dhadar Section of N-65 (110.256 km)” at a cost of Rs55.379 billion for approval of CDWP/ECNEC.

The NHA Executive Board recommended the “PC-I for Dualisation and Strengthening of Dhadar–Jacobabad Section of N–65 (188 km)” at a cost of Rs50,824.93 million for approval of CDWP/ ECNEC.

The board recommended the “PC-I for Construction of Kharan–Basima Highway (123 km)” at a cost of Rs63.400 billion for approval of CDWP/ ECNEC. The NHA Executive Board recommended the “PC-I for Construction of Wangu Hill Tunnel on M-8 (22 km)” at a cost of Rs62,258.408 million for approval of CDWP/ ECNEC.

The board also recommended “PC-I of Electrical & Mechanical (E&M) works, operational buildings, bridges of Access Roads (PKG-II) and pending liability of Lowari Tunnel Project” amounting to Rs37.257 billion for approval of CDWP/ECNEC. The NHA will ensure third party validation prior to presenting this PC-I before CDWP.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.