BR100 Decreased By (-0.4%)
BR30 Decreased By (-0.65%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)
By

TOKYO: Tokyo Electric Power Co will start loading nuclear fuel into reactor No. 7 at its Kashiwazaki-Kariwa power station on Monday, it said in a statement, as it prepares for safety tests seeking to restart the world’s biggest nuclear plant.

The Kashiwazaki-Kariwa plant has been offline since 2012 after another Tepco plant in Fukushima was hit by a tsunami a year earlier which led to the shutdown of all nuclear plants in Japan at the time.

Tepco said on Monday that Japan’s Nuclear Regulation Authority has granted the company approval to test safety of the Kashiwazaki-Kariwa’s equipment, and it plans to begin loading nuclear fuel into reactor No.7 later in the day.

Tepco seeks regulatory approval to load nuclear fuel into Kashiwazaki-Kariwa plant

Tepco needs consent from Niigata prefecture, where the plant is located, to resume operations.

The prefecture governor said last month more talks were needed over the possible restart, suggesting operations may not resume quickly.

Tepco’s shares were 6% up in Tokyo midday trading following the approval, outperforming the Nikkei index which was 1% down.

Comments

Comments are closed for this article.