BR100 Increased By (0.78%)
BR30 Increased By (0.96%)
KSE100 Increased By (0.77%)
KSE30 Increased By (0.85%)
AGHA 7.75 Increased By ▲ 0.29 (3.89%)
BECO 5.38 Increased By ▲ 0.11 (2.09%)
BML 58.70 Increased By ▲ 1.44 (2.51%)
BOP 36.20 Increased By ▲ 1.45 (4.17%)
CNERGY 11.03 Decreased By ▼ -0.03 (-0.27%)
CSIL 6.02 Increased By ▲ 0.19 (3.26%)
FCCL 56.73 Increased By ▲ 0.31 (0.55%)
FFL 16.55 Increased By ▲ 0.14 (0.85%)
FNEL 1.21 Increased By ▲ 0.01 (0.83%)
KEL 7.38 Increased By ▲ 0.06 (0.82%)
KOSM 6.13 Decreased By ▼ -0.02 (-0.33%)
LOTCHEM 27.16 Increased By ▲ 0.04 (0.15%)
MLCF 98.85 Increased By ▲ 0.91 (0.93%)
NBP 208.75 Increased By ▲ 1.87 (0.9%)
NCPL 57.15 Increased By ▲ 0.73 (1.29%)
NPL 66.20 Increased By ▲ 0.43 (0.65%)
OGDC 318.85 Increased By ▲ 2.55 (0.81%)
PACE 11.20 Increased By ▲ 0.33 (3.04%)
PAEL 42.94 Increased By ▲ 0.64 (1.51%)
PIBTL 17.05 Increased By ▲ 0.27 (1.61%)
PPL 222.85 Increased By ▲ 2.16 (0.98%)
PRL 63.27 Decreased By ▼ -0.38 (-0.6%)
PTC 72.16 Increased By ▲ 0.34 (0.47%)
SSGC 27.16 Increased By ▲ 0.08 (0.3%)
TBL 9.86 Increased By ▲ 0.14 (1.44%)
TELE 8.78 Increased By ▲ 0.05 (0.57%)
TPL 19.91 Increased By ▲ 0.51 (2.63%)
TPLP 14.82 Increased By ▲ 0.04 (0.27%)
TREET 23.70 Increased By ▲ 0.30 (1.28%)
TRG 61.85 Increased By ▲ 0.44 (0.72%)

LAHORE: NESPAK, a renowned engineering consultancy firm, has clinched a monumental project involving 574 dams in the Kingdom of Saudi Arabia (KSA).

The contract, valued at Rs5.2 billion (SAR 69.5 million) for consultancy services, underscores NESPAK’s extensive expertise in water resources and dam engineering. Zargham Eshaq Khan, Managing Director of NESPAK, made this announcement on Friday.

The Ministry of Environment, Water, and Agriculture (MEWA) of KSA awarded the project to NESPAK’s KSA Office. The consultancy services, slated to span 36 months, entail a comprehensive scope. This includes a hydrological assessment of 574 existing dams, flood protection works at 240 locations, detailed design, and tender document preparation for 40 dams, as well as detailed physical inspections of 60 dams and the formulation of dam safety guidelines.

Covering all regions of KSA, the project necessitates collaboration among professionals from various divisions within NESPAK. Khalid Mahmood, General Manager of the Water & Agriculture Division, will spearhead the project as the Project Manager. This milestone not only contributes to enhancing water infrastructure in KSA but also bolsters NESPAK’s standing as a premier engineering consultancy firm in the region.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.