BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

ISLAMABAD: In a landmark development, an injection of gas supply into the SNGPL’s network from the OGDCL’s newly-discovered gas field namely, Wali (Bettani) in district Lakki Marwat of Khyber-Pakhtunkhwa, has started earlier this morning (Friday).

The Oil and Gas Development Corporation (OGDCL) had discovered Wali gas field last year. Accordingly, Prime Minister Shehbaz Sharif and the Federal Ministry of Energy (Petroleum Division) had directed the SNGPL to lay pipelines for an injection of gas from the newly-discovered gas field.

The gas flow from Wali gas field will be processed at the OGDCL’s facility before being injected into Sui Northern’s transmission system.

OGDCL drills 4 wells, makes 3 discoveries in 1HFY23

The current gas supply flow rate from the gas field is 10 MMCFD which is expected to rise to 20 MMCFD in the near future. The gas is supplied vide recently constructed 50-kilometer-long high-pressure pipeline connecting OGDCL’s processing plant to the Sui Northern’s network at Kaka Khel, district Lakki Marwat. In addition, the SNGPL also constructed a 16-kilometer-long gathering line on the OGDCL’s request as contractor.

The SNGPL faced security issues during the construction of pipelines but despite all the odds, the company efficiently managed to complete the construction of 66-kilometer pipelines of 8-inch diameter from Wali Well to Kakakhel Valve Assembly in the shortest possible time.

Both the pipeline segments comprising of 16-kilometer segment from the well to the processing plant and 50-kilometer segment from the processing plant to Kakakhel Valve Assembly were successfully commissioned on 14 and 15 June, respectively.

The before time completion of pipeline construction project for injection of gas, which carries significant national importance owing to the prevailing energy crisis, was only made possible through the guidance of the company’s Board of Directors and the current management along with steadfast dedication and hard work of the SNGPL’s workforce.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.

Tulukan Mairandi Jun 17, 2023 09:06am
For context, it supplies some USD13,000 worth of gas a day. In many countries such a field would be considered "not viable"
0
Ali Asghar Jun 17, 2023 09:33am
Thulu mairandi going berserk on this news...lol
0
Abdullah Jun 17, 2023 11:21am
@Tulukan Mairandi, why is it hurting you dear.
0
Builder Jun 17, 2023 12:19pm
It's hurting @Tulukan Mairandi 'cause he is part of Indian media warfare. This guys should be blocked permanently.
0
Khan Jun 17, 2023 02:36pm
@Tulukan Mairandi, @ what rate per mmbtu? Your calculation is based on 1 dollar per mmbtu and 10 mmcfd per day!
0