BAFL 48.25 Increased By ▲ 1.75 (3.76%)
BIPL 21.80 Increased By ▲ 0.65 (3.07%)
BOP 5.64 Increased By ▲ 0.11 (1.99%)
CNERGY 5.10 Increased By ▲ 0.20 (4.08%)
DFML 19.50 Increased By ▲ 0.68 (3.61%)
DGKC 81.10 Increased By ▲ 1.10 (1.38%)
FABL 32.10 Increased By ▲ 1.25 (4.05%)
FCCL 20.65 Increased By ▲ 0.26 (1.28%)
FFL 9.82 Increased By ▲ 0.26 (2.72%)
GGL 14.00 Increased By ▲ 0.03 (0.21%)
HBL 122.61 Increased By ▲ 4.66 (3.95%)
HUBC 124.80 Increased By ▲ 1.00 (0.81%)
HUMNL 8.30 Increased By ▲ 0.35 (4.4%)
KEL 3.69 Increased By ▲ 0.18 (5.13%)
LOTCHEM 28.80 Increased By ▲ 0.25 (0.88%)
MLCF 42.49 Increased By ▲ 0.39 (0.93%)
OGDC 122.25 Increased By ▲ 1.24 (1.02%)
PAEL 19.40 Increased By ▲ 0.56 (2.97%)
PIBTL 5.85 Increased By ▲ 0.15 (2.63%)
PIOC 117.51 Increased By ▲ 3.80 (3.34%)
PPL 110.70 Increased By ▲ 2.35 (2.17%)
PRL 29.58 Increased By ▲ 1.76 (6.33%)
SILK 1.09 Increased By ▲ 0.02 (1.87%)
SNGP 70.59 Increased By ▲ 1.19 (1.71%)
SSGC 13.88 Increased By ▲ 0.63 (4.75%)
TELE 9.13 Increased By ▲ 0.34 (3.87%)
TPLP 14.38 Increased By ▲ 0.73 (5.35%)
TRG 95.75 Increased By ▲ 3.81 (4.14%)
UNITY 27.85 Increased By ▲ 1.19 (4.46%)
WTL 1.63 Increased By ▲ 0.06 (3.82%)
BR100 6,647 Increased By 103.3 (1.58%)
BR30 23,762 Increased By 551.8 (2.38%)
KSE100 64,643 Increased By 724.9 (1.13%)
KSE30 21,582 Increased By 230.5 (1.08%)

ISLAMABAD: Asia Petroleum Limited (APL) has proposed repurposing its pipeline to transport High Speed Diesel (HSD) from Hub to Zulfiqarabad Oil Terminal (ZOT) and from there to upcountry through the White Oil Pipeline System (WOP) as Hubco is consistently on low in merit.

In a letter to Petroleum Division, Babar Hamid Chaudhary, MD/ CEO APL referred to the Implementation Agreement (IA) of June 28, 2003 between the President of Pakistan (GoP) and APL and the meeting on February 7, 2023 during which this matter was discussed in detail.

APL is an energy infrastructure company which owns and operates an oil terminal (mainly comprising of pumping and heating facilities) and an 82-km pipeline system extending from Pakistan State Oil Company Limited’s (PSO) Zulfiqarabad Oil Terminal (ZOT) at Port Qasim Karachi to the Hub Power Company Limited (Hubco) Complex at Hub Balochistan

PL on HSD to go up by Rs5/litre

The Pipeline was constructed to transport the Residual Fuel Oil (RFO) requirements of Hubco (the first independent power project established in Pakistan) from ZOT to enable PSO to meet its RFO delivery commitments under its Fuel Supply Agreement with Hubco (FSA). Under the arrangements, APL’s role is limited to transportation. The pipeline operates under a security package of documents (APL Security Package) including the IA and a Fuel Transportation Agreement (FTA) with PSO. The initial term of these documents and of PSO’s obligations to supply RFO to Hubco are scheduled to expire in March 2027.

CEO APL further elaborated that the pipeline is currently dedicated to the movement of RFO to Hubco but given the dwindling use of RFO and increasing preference given for more cost-effective power generation options, Hubco has, over the last few years, consistently been low on the merit order and so its dispatch is very low and is likely to remain so. This means that the pipeline, which provides a safe environmentally friendly and efficient link between Hub, Balochistan and ZOT is seriously underutilized and often idle which is unconscionable for such an important strategic asset. While the APL Security Package does contemplate supply to other parties, given the dwindling use of RFO and lack of alternate RFO customers in the area, it is not feasible to use the pipeline for supply of RFO to other parties in the vicinity.

Copyright Business Recorder, 2023

Comments

Comments are closed.

Aamir Latif May 29, 2023 10:49am
Long over due to revive unproductive business model of APL... A petroleum product pipeline network badly under utilized... Instead decade old business model of having crude storage terminal using SBM's and using VLCC to import crude as best option due to its economic of scale to these small 75,000dwt tankers in PQA or KPT... Difference of freight was $3 / ton then in 2007 when I worked on this project... GoP should seriously revitalize this business model, will use existing pipeline connectivity with NRL , PRL and PARCO black oil. PARCO's coastal Refinery in Hub when constructed can be easily connected using APL pipeline ROW...
thumb_up Recommended (0)

Transportation of HSD: APL proposes to repurpose its Hub-ZOT pipeline

Intra-day update: rupee strengthens against US dollar

Intra-day update: KSE-100 crosses 64,500 after over 600-point gain

‘Illegal’ LCs, forex market speculation: MoF set to share list of banks with SIFC today

Illegal foreigners seriously affecting Pakistan’s security, economy: COAS

FWBL sell-off: Minister briefed about status of accounts

Digitising budget process: Shamshad chairs IMF mission meeting

Loss-making Discos: FD opposes PD’s proposal

Power sector: Nepra backs transition from Libor to ‘SOFR’

‘Delayed’ CASA-1000 project: World Bank reluctant to arrange funds

New FAB ED: govt initiates appointment process