AIRLINK 65.20 Decreased By ▼ -0.70 (-1.06%)
BOP 5.57 Decreased By ▼ -0.12 (-2.11%)
CNERGY 4.56 Decreased By ▼ -0.09 (-1.94%)
DFML 24.52 Increased By ▲ 1.67 (7.31%)
DGKC 69.96 Decreased By ▼ -0.74 (-1.05%)
FCCL 20.30 Decreased By ▼ -0.05 (-0.25%)
FFBL 29.11 No Change ▼ 0.00 (0%)
FFL 9.83 Decreased By ▼ -0.10 (-1.01%)
GGL 10.01 Decreased By ▼ -0.07 (-0.69%)
HBL 114.25 Decreased By ▼ -1.00 (-0.87%)
HUBC 129.10 Decreased By ▼ -0.40 (-0.31%)
HUMNL 6.71 Increased By ▲ 0.01 (0.15%)
KEL 4.44 Increased By ▲ 0.06 (1.37%)
KOSM 4.89 Decreased By ▼ -0.13 (-2.59%)
MLCF 37.00 Increased By ▲ 0.04 (0.11%)
OGDC 132.30 Increased By ▲ 1.10 (0.84%)
PAEL 22.54 Increased By ▲ 0.06 (0.27%)
PIAA 25.89 Decreased By ▼ -0.41 (-1.56%)
PIBTL 6.60 Increased By ▲ 0.07 (1.07%)
PPL 112.85 Increased By ▲ 0.73 (0.65%)
PRL 29.41 Increased By ▲ 1.02 (3.59%)
PTC 15.24 Decreased By ▼ -0.87 (-5.4%)
SEARL 57.03 Decreased By ▼ -1.26 (-2.16%)
SNGP 66.45 Increased By ▲ 0.76 (1.16%)
SSGC 10.98 Decreased By ▼ -0.04 (-0.36%)
TELE 8.80 Decreased By ▼ -0.14 (-1.57%)
TPLP 11.70 Increased By ▲ 0.17 (1.47%)
TRG 68.62 Decreased By ▼ -0.62 (-0.9%)
UNITY 23.40 Decreased By ▼ -0.55 (-2.3%)
WTL 1.38 Increased By ▲ 0.03 (2.22%)
BR100 7,295 Decreased By -9.1 (-0.12%)
BR30 23,854 Decreased By -96 (-0.4%)
KSE100 70,290 Decreased By -43.2 (-0.06%)
KSE30 23,171 Increased By 50.4 (0.22%)

ISLAMABAD: National Logistics Cell (NLC) has developed three projects in health and education sectors in far flung areas of Gilgit-Baltistan.

These projects being developed as part of Corporate Social Responsibility (CSR) initiative have been handed over to the local administration after completion of work.

The CSR projects include rehabilitation of middle school at Naltar Paine, upgradation of Basic Health Unit (BHU) at Nomal and boys school at Sost.

Students of the middle school located in Naltar Paine were facing difficulties in absence of facilities in harsh weather conditions. Upon request of the locals, NLC Engineers undertook construction work including partitions walls, roof of ceiling, fixing of doors, windows, electrical and other face lifting works.

Likewise, rehabilitation of Basic Health Unit at Nomal was also carried out by NLC Engineers. The facility caters to the needs of people of Nomal and adjoining areas. A large number of patients are benefited with provision of additional facilities at the BHU Nomal.

NLC engineers also constructed a school for boys at Sost. The scope of work included complete double story building from foundation till finishing work and provision of allied facilities. All these projects have been developed by NLC free of cost and is part of CSR initiatives being undertaken by NLC across Pakistan.

Copyright Business Recorder, 2023

Comments

Comments are closed.