AIRLINK 151.71 Decreased By ▼ -4.00 (-2.57%)
BOP 10.05 Decreased By ▼ -0.26 (-2.52%)
CNERGY 7.30 Decreased By ▼ -0.35 (-4.58%)
CPHL 85.11 Decreased By ▼ -3.06 (-3.47%)
FCCL 46.57 Decreased By ▼ -0.79 (-1.67%)
FFL 15.78 Decreased By ▼ -0.34 (-2.11%)
FLYNG 54.86 Decreased By ▼ -3.15 (-5.43%)
HUBC 136.89 Decreased By ▼ -1.63 (-1.18%)
HUMNL 11.25 Decreased By ▼ -0.29 (-2.51%)
KEL 5.34 Decreased By ▼ -0.13 (-2.38%)
KOSM 5.63 Increased By ▲ 0.17 (3.11%)
MLCF 82.84 Decreased By ▼ -0.91 (-1.09%)
OGDC 208.86 Decreased By ▼ -3.19 (-1.5%)
PACE 6.05 Increased By ▲ 0.19 (3.24%)
PAEL 41.46 Decreased By ▼ -1.76 (-4.07%)
PIAHCLA 22.38 Increased By ▲ 0.62 (2.85%)
PIBTL 8.19 Decreased By ▼ -0.23 (-2.73%)
POWER 13.80 Decreased By ▼ -0.56 (-3.9%)
PPL 167.09 Decreased By ▼ -3.90 (-2.28%)
PRL 32.17 Decreased By ▼ -1.32 (-3.94%)
PTC 24.43 Decreased By ▼ -1.07 (-4.2%)
SEARL 89.83 Decreased By ▼ -3.06 (-3.29%)
SSGC 41.52 Decreased By ▼ -0.40 (-0.95%)
SYM 14.86 Decreased By ▼ -0.14 (-0.93%)
TELE 7.69 Decreased By ▼ -0.13 (-1.66%)
TPLP 9.14 Decreased By ▼ -0.17 (-1.83%)
TRG 63.20 Decreased By ▼ -1.02 (-1.59%)
WAVESAPP 9.14 Decreased By ▼ -0.28 (-2.97%)
WTL 1.45 Increased By ▲ 0.08 (5.84%)
YOUW 4.15 Decreased By ▼ -0.04 (-0.95%)
BR100 13,037 Decreased By -207.6 (-1.57%)
BR30 37,726 Decreased By -745.3 (-1.94%)
KSE100 122,144 Decreased By -1949.6 (-1.57%)
KSE30 36,883 Decreased By -653.4 (-1.74%)

KARACHI: Sindh Chief Minister Syed Murad Ali Shah has said that 1320-MW of coal-fired energy has been added to the national grid this month and another 660-MW would be added next year.

“The solution to the country’s energy crisis lies in Thar coal,” he said on Monday while presiding over a board meeting of Thar Coal Energy here.

Minister Energy Imtiaz Shaikh briefing the meeting said that Sino-Sindh Resources (SSR) started coal excavation work in Block-I in January 2022 it has completed 99 percent work to excavate 7.8-mtpa coal by December 31, 2022. He added that it was a CPEC project.

The Power Engineering Company has installed two 660-MW coal-fired power plants for $2 billion. Both the power plants successfully synchronized with the national grid on December 2 and December 11, 2022, respectively.

Imtiaz Shaikh said that SECM planned to expand the mine from 7.6 Mtpa to 12.2 Mtpa mine. He said that Lucky Electric Power has started work on a 660-MW power plant for which it would be supplied 3.6 Mtpa coal. This plant would start commercial operation in 2024.

Thar Energy has already synchronized its 330 MW coal-fired power plant with the national Grid in October 2022 and another 330-MW plant would start commercial operation by 2023.

The meeting was attended by Minister Education Syed Sardar Shah, Minister Energy Imtiaz Shaikh, Advisor Law Murtaza Wahab, Chief Secretary Sohail Rajput, PSCM Fayaz Jatoi, DG Coal Authority Khadim Channa, and others. Minister BISP Shazia Marri, Special Assistant to PM Tariq Bajwa, Federal Secretary Energy Rashid Langrial, Federal Secretary Law Raja Naeem Akbar, and others attended the meeting through video link.

Copyright Business Recorder, 2022

Comments

Comments are closed.