BR100 Increased By (0.03%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.07%)
KSE30 Increased By (0.08%)
AGHA 6.62 Decreased By ▼ -0.05 (-0.75%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.10 Decreased By ▼ -0.02 (-0.07%)
CNERGY 12.92 Decreased By ▼ -0.06 (-0.46%)
CSIL 5.32 Increased By ▲ 0.01 (0.19%)
FCCL 51.90 Increased By ▲ 0.25 (0.48%)
FFL 14.52 Increased By ▲ 0.03 (0.21%)
FNEL 1.24 Increased By ▲ 0.03 (2.48%)
KEL 6.06 No Change ▼ 0.00 (0%)
KOSM 5.89 Increased By ▲ 0.05 (0.86%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 91.36 Increased By ▲ 0.13 (0.14%)
NBP 163.90 Decreased By ▼ -0.29 (-0.18%)
NCPL 53.49 Increased By ▲ 0.31 (0.58%)
NPL 59.40 Increased By ▲ 0.28 (0.47%)
OGDC 312.70 Decreased By ▼ -0.69 (-0.22%)
PACE 9.71 Decreased By ▼ -0.06 (-0.61%)
PAEL 35.25 Increased By ▲ 0.01 (0.03%)
PIBTL 14.77 Increased By ▲ 0.06 (0.41%)
PPL 220.49 Decreased By ▼ -0.87 (-0.39%)
PRL 91.40 Increased By ▲ 0.18 (0.2%)
PTC 59.65 Increased By ▲ 0.46 (0.78%)
SSGC 23.48 Increased By ▲ 0.18 (0.77%)
TBL 8.83 Increased By ▲ 0.08 (0.91%)
TELE 7.65 Increased By ▲ 0.04 (0.53%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.40 Decreased By ▼ -0.16 (-1.27%)
TREET 21.77 Increased By ▲ 0.04 (0.18%)
TRG 56.09 Increased By ▲ 0.30 (0.54%)

KARACHI: Artistic Milliners and Reon Energy have announced an 8.5 MW captive solar power project, set to be installed across Artistic Milliner’s 7 units located in Korangi, Landhi and Port Qasim industrial areas in Karachi.

The 8.5 MW solar PV project is expected to produce approximately 13.5 GWh (Gigawatt hours) annually. The output energy will be used on-site resulting in substantial savings for the company in cost of energy and will also cut around 8,279 tonnes of CO2 equivalent emissions, annually.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.