BR100 Increased By (0.84%)
BR30 Increased By (0.71%)
KSE100 Increased By (0.68%)
KSE30 Increased By (0.69%)
AGHA 7.77 Increased By ▲ 0.02 (0.26%)
BECO 5.20 Increased By ▲ 0.01 (0.19%)
BML 57.93 Decreased By ▼ -0.73 (-1.24%)
BOP 34.28 Increased By ▲ 0.59 (1.75%)
CNERGY 10.83 Increased By ▲ 0.22 (2.07%)
CSIL 5.48 Increased By ▲ 0.18 (3.4%)
FCCL 54.35 Increased By ▲ 0.61 (1.14%)
FFL 16.66 Increased By ▲ 0.20 (1.22%)
FNEL 1.23 Increased By ▲ 0.01 (0.82%)
KEL 7.39 Increased By ▲ 0.11 (1.51%)
KOSM 5.77 Increased By ▲ 0.13 (2.3%)
LOTCHEM 29.83 Increased By ▲ 0.18 (0.61%)
MLCF 95.51 Decreased By ▼ -0.85 (-0.88%)
NBP 204.85 Increased By ▲ 1.32 (0.65%)
NCPL 57.91 Increased By ▲ 1.06 (1.86%)
NPL 69.31 Increased By ▲ 2.00 (2.97%)
OGDC 318.39 Increased By ▲ 0.17 (0.05%)
PACE 10.82 Increased By ▲ 0.19 (1.79%)
PAEL 43.00 Increased By ▲ 1.23 (2.94%)
PIBTL 16.90 Increased By ▲ 0.09 (0.54%)
PPL 221.00 Increased By ▲ 0.83 (0.38%)
PRL 52.05 Increased By ▲ 3.00 (6.12%)
PTC 71.30 Increased By ▲ 1.29 (1.84%)
SSGC 29.33 Increased By ▲ 0.19 (0.65%)
TBL 9.89 Increased By ▲ 0.12 (1.23%)
TELE 8.90 Increased By ▲ 0.08 (0.91%)
TPL 17.79 Increased By ▲ 0.62 (3.61%)
TPLP 12.95 Increased By ▲ 0.44 (3.52%)
TREET 22.83 Increased By ▲ 0.24 (1.06%)
TRG 60.00 Decreased By ▼ -0.22 (-0.37%)

KARACHI: President SITE Association of Industry, Abdul Rasheed has demanded the government to direct SSGC to provide gas to industries of SITE with required pressure to complete export orders without disruption.

He protested over zero gas pressure in the SITE area, and said that it is impossible to run industry. Industrial production has come to a halt and shipping export orders on time is also not possible. He added that the SITE area is hurt the most as compared to other industrial areas of Karachi.

Expressing dismay over the prevailing situation, SAI President said that despite increasing prices and promises by the government, the gas pressure has come down to zero which is nullifying the government's own claim of facilitating the foreign exchange earning export sector.

Abdul Rasheed demanded the government to accord first priority to industries over all other sectors and ensures that the SSGC supplies gas to Industries with required pressure on an emergent basis.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.