BML 5.06 No Change ▼ 0.00 (0%)
BOP 13.00 Increased By ▲ 1.14 (9.61%)
CNERGY 7.12 Decreased By ▼ -0.07 (-0.97%)
CPHL 86.07 Decreased By ▼ -0.81 (-0.93%)
DCL 14.67 Decreased By ▼ -0.28 (-1.87%)
DGKC 168.81 Increased By ▲ 0.58 (0.34%)
FCCL 46.17 Decreased By ▼ -0.04 (-0.09%)
FFL 15.92 Decreased By ▼ -0.08 (-0.5%)
GCIL 27.26 Increased By ▲ 0.13 (0.48%)
HUBC 141.91 Increased By ▲ 0.91 (0.65%)
KEL 5.12 Increased By ▲ 0.02 (0.39%)
KOSM 6.89 Increased By ▲ 0.24 (3.61%)
LOTCHEM 21.00 Decreased By ▼ -0.16 (-0.76%)
MLCF 84.07 Decreased By ▼ -0.86 (-1.01%)
NBP 122.38 Increased By ▲ 2.52 (2.1%)
PAEL 42.18 Increased By ▲ 0.21 (0.5%)
PIAHCLA 21.96 Decreased By ▼ -1.27 (-5.47%)
PIBTL 8.99 Increased By ▲ 0.12 (1.35%)
POWER 14.09 Decreased By ▼ -0.01 (-0.07%)
PPL 169.95 Decreased By ▼ -0.97 (-0.57%)
PREMA 43.77 Decreased By ▼ -0.30 (-0.68%)
PRL 32.87 Decreased By ▼ -0.17 (-0.51%)
PTC 24.59 Decreased By ▼ -0.31 (-1.24%)
SNGP 119.30 Decreased By ▼ -0.04 (-0.03%)
SSGC 45.17 Decreased By ▼ -0.36 (-0.79%)
TELE 8.17 Decreased By ▼ -0.13 (-1.57%)
TPLP 10.33 Decreased By ▼ -0.35 (-3.28%)
TREET 24.15 Decreased By ▼ -0.23 (-0.94%)
TRG 58.85 Increased By ▲ 0.99 (1.71%)
WTL 1.55 Decreased By ▼ -0.03 (-1.9%)
BR100 13,570 Increased By 108.3 (0.8%)
BR30 39,660 Increased By 128.4 (0.32%)
KSE100 133,782 Increased By 1205.4 (0.91%)
KSE30 40,682 Increased By 323 (0.8%)

MOSCOW: Gazprom said on Friday it had finished construction of the Nord Stream 2 subsea pipeline to Germany, allowing Russia to potentially double lucrative gas exports to Europe via the Baltic Sea while bypassing and cutting off a source of income for political foe Ukraine.

Although gas flows have yet to be cleared by German regulators, the completion of the construction stage means Russia has successfully boosted its energy exporting capabilities towards Europe both from the north in the Baltic Sea and from the south in the Black Sea, where it operates the TurkStream pipeline.

“The head of the management board, Alexei Miller, told the morning meeting at Gazprom that the construction of Nord Stream 2 was fully completed today in the morning at 0845 Moscow time,” Gazprom said.

Gazprom started construction of the 1,200-km long Nord Stream 2 pipeline from Russia to Germany five years ago. Progress of the $11 billion project stalled at the end of 2019 when then U.S. president Donald Trump imposed sanctions on it.

The construction restarted around a year later with the engagement of Russia’s own vessels.

The route, jointly with the existing Nord Stream pipeline, will double the annual export capacity to 110 billion cubic metres, around half of Russia’s total gas exports to Europe a year.

The project has drawn criticism from the United States and Ukraine among others. Washington says it will increase Europe’s reliance on Russian energy supplies, while it is seeking to boost its own sales of sea-borne liquefied natural gas to Europe.

The United States has called its super-chilled gas exports to Europe a way to spread “molecules of freedom” across the Atlantic.

Gazprom is Europe’s largest supplier of natural gas, accounting for more than a third of the region’s gas market.

Russia said on Thursday pumping commercial gas supplies via Nord Stream 2 would not start until a German regulator gives the green light.

Comments

Comments are closed.