AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,943 Increased By 105.5 (1.35%)
BR30 25,639 Increased By 187.1 (0.73%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

KARACHI: Divisional Superintendent Pakistan Railways Karachi Muhammad Hanif Gul conducted footplate inspection of 450 kilometres long Up and Down railways track on Main Line-1 between Karachi and Tandoadam.

The Up line inspection of 225 kilometres from Karachi to Tandoadam was carried out from 13Up Awam Express whereas the reciprocal downline inspection was accomplished on 6 Down Green Line.

Flootplate inspections are periodic inspections in the inspection regime of Pakistan Railways, conducted from locomotive of a moving train, that help in assessing multiple infrastructure- and operation-related parameters like: functioning of signal systems, observation of engineering restrictions, operation of manned level crossings’ by the staff, trespassing (if any) from unmanned level crossing, condition of track and locomotive, and last but not least status of Right-of-Way area along the track.

The previous footplate inspection between Karachi and Tandoadam by the incumbent DS Karachi was held earlier this year in March; nevertheless all the divisional officers routinely perform the footplate inspection of the track within the division.

Meanwhile, in a yet another anti-encroachment and land retrieval operation, Pakistan Railways Karachi division retrieved 18 residential quarters from its colony in Kotri. The quarters were of class IV category and were occupied illegally, officials said.

Copyright Business Recorder, 2021

Comments

Comments are closed.