AIRLINK 74.29 No Change ▼ 0.00 (0%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.34 Decreased By ▼ -0.03 (-0.69%)
DFML 39.14 Increased By ▲ 0.34 (0.88%)
DGKC 84.90 Increased By ▲ 0.08 (0.09%)
FCCL 21.20 Decreased By ▼ -0.01 (-0.05%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.73 Increased By ▲ 0.03 (0.31%)
GGL 10.50 Increased By ▲ 0.08 (0.77%)
HBL 112.80 Decreased By ▼ -0.20 (-0.18%)
HUBC 136.22 Increased By ▲ 0.02 (0.01%)
HUMNL 11.90 No Change ▼ 0.00 (0%)
KEL 4.75 Increased By ▲ 0.04 (0.85%)
KOSM 4.50 Increased By ▲ 0.06 (1.35%)
MLCF 37.85 Increased By ▲ 0.20 (0.53%)
OGDC 136.21 Increased By ▲ 0.01 (0.01%)
PAEL 25.13 Increased By ▲ 0.03 (0.12%)
PIAA 19.75 Increased By ▲ 0.51 (2.65%)
PIBTL 6.72 Increased By ▲ 0.01 (0.15%)
PPL 122.00 Decreased By ▼ -0.10 (-0.08%)
PRL 26.70 Increased By ▲ 0.05 (0.19%)
PTC 13.98 Increased By ▲ 0.05 (0.36%)
SEARL 56.99 Decreased By ▼ -0.23 (-0.4%)
SNGP 67.90 Increased By ▲ 0.30 (0.44%)
SSGC 10.22 Decreased By ▼ -0.03 (-0.29%)
TELE 8.37 Decreased By ▼ -0.03 (-0.36%)
TPLP 11.15 Increased By ▲ 0.02 (0.18%)
TRG 63.25 Increased By ▲ 0.44 (0.7%)
UNITY 26.60 Increased By ▲ 0.10 (0.38%)
WTL 1.36 Increased By ▲ 0.01 (0.74%)
BR100 7,804 Decreased By -6 (-0.08%)
BR30 25,154 Increased By 4.2 (0.02%)
KSE100 74,929 Decreased By -27.7 (-0.04%)
KSE30 24,058 Decreased By -25.1 (-0.1%)
World

Suez Canal starts dredging work to extend double lane

  • The SCA announced this week that it was planning to extend a second canal lane that opened in 2015 by 10 km to make it 82 km long, and would widen and deepen a single lane stretch at the southern end of the canal.
  • The work had begun following directives from Egyptian President Abdel Fattah al-Sisi "to immediately start implementing the proposed development plan and put in place a timetable for completion as soon as possible".
Published May 15, 2021

CAIRO: The Suez Canal Authority (SCA) has started dredging work to extend a second lane that allows for two-way traffic in a southern section of the canal near to where a giant container ship got stuck for six days in March, it said on Saturday.

The SCA announced this week that it was planning to extend a second canal lane that opened in 2015 by 10 km to make it 82 km long, and would widen and deepen a single lane stretch at the southern end of the canal.

The work had begun following directives from Egyptian President Abdel Fattah al-Sisi "to immediately start implementing the proposed development plan and put in place a timetable for completion as soon as possible", the SCA said on Saturday.

The grounding of the 440-metre Ever Given container ship in a southern section of the canal from March 23-29 delayed the passage of hundreds of vessels through the waterway, disrupting global trade.

The Ever Given, still loaded with thousands of containers, is being held in the Great Bitter Lake between two stretches of the canal, amid a dispute over an SCA compensation claim against the ship's Japanese owner Shoei Kisen.

Comments

Comments are closed.