BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)
Pakistan

Chairman NEPRA calls on Sadiq Sanjrani

  • Chairman Senate urged that an effective plan needs to be formulated to provide electricity facilities to the remote areas of Balochistan.
Published Updated
By

ISLAMABAD: Chairman National Electronic Power Regulatory Authority (NEPRA) along with member NEPRA Balochistan Wednesday called on Chairman Senate Muhammad Sadiq Sanjarani here at Parliament House to brief him on power supply in the province.

While exchanging views on the overall energy situation in the province the Chairman Senate said that the power system in Balochistan should be improved further.

In order to give relief to the people of Balochistan in the energy sector, the Chairman Senate directed NEPRA officials to complete the ongoing projects in the province at the earliest.

“Local resources should be utilized to increase the power generation capacity in the province”, he further added. Chairman, during the meeting, also directed the visiting dignitaries to take immediate steps to control load-shedding in the province.

Keeping in view the importance of Gawadar, Sadiq Sanjrani directed Chairman Nepra and member NEPRA ( Balochistan) to complete power supply projects in Gawadar as soon as possible.

Chairman Senate urged that an effective plan needs to be formulated to provide electricity facilities to the remote areas of Balochistan.

He emphasized that reliance on alternative energy sources would reduce load-shedding, therefore it was necessary to take effectual steps to generate clean and cheap electricity from alternative resources. Suitable steps should also be taken for power generation, he stressed.

Comments

Comments are closed for this article.