AIRLINK 71.69 Decreased By ▼ -2.41 (-3.25%)
BOP 5.00 No Change ▼ 0.00 (0%)
CNERGY 4.39 Increased By ▲ 0.05 (1.15%)
DFML 28.55 Decreased By ▼ -0.99 (-3.35%)
DGKC 82.40 Decreased By ▼ -1.15 (-1.38%)
FCCL 21.95 Decreased By ▼ -0.48 (-2.14%)
FFBL 34.15 Decreased By ▼ -0.75 (-2.15%)
FFL 10.08 Increased By ▲ 0.21 (2.13%)
GGL 10.12 Increased By ▲ 0.12 (1.2%)
HBL 113.00 Increased By ▲ 1.00 (0.89%)
HUBC 140.50 Increased By ▲ 2.81 (2.04%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.38 Decreased By ▼ -0.02 (-0.45%)
KOSM 4.50 Decreased By ▼ -0.09 (-1.96%)
MLCF 38.01 Decreased By ▼ -0.54 (-1.4%)
OGDC 134.69 Decreased By ▼ -1.91 (-1.4%)
PAEL 26.62 Increased By ▲ 1.48 (5.89%)
PIAA 25.40 Decreased By ▼ -1.11 (-4.19%)
PIBTL 6.55 Decreased By ▼ -0.10 (-1.5%)
PPL 121.95 Decreased By ▼ -3.45 (-2.75%)
PRL 27.73 Decreased By ▼ -0.48 (-1.7%)
PTC 13.80 Decreased By ▼ -0.50 (-3.5%)
SEARL 54.89 Increased By ▲ 0.29 (0.53%)
SNGP 69.70 Decreased By ▼ -1.50 (-2.11%)
SSGC 10.40 Decreased By ▼ -0.10 (-0.95%)
TELE 8.50 Decreased By ▼ -0.02 (-0.23%)
TPLP 10.95 Increased By ▲ 0.01 (0.09%)
TRG 60.90 Increased By ▲ 0.20 (0.33%)
UNITY 25.22 Decreased By ▼ -0.11 (-0.43%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
BR100 7,619 Decreased By -45.8 (-0.6%)
BR30 24,969 Decreased By -56.1 (-0.22%)
KSE100 72,761 Decreased By -3 (-0%)
KSE30 23,625 Decreased By -150.3 (-0.63%)
Pakistan

Power generation of Tarbela Dam reduces to 440 MW

  • Water inflow in the dam was 16800 cusecs whereas outflow from Tarbela dam was 24000 cusecs feet while the water level of the dam reached 1409.2 feet.
Published March 4, 2021

TARBELA: Nine power generation units of Tarbela dam have been shut down due to the low water level in the lake and power production capacity has reached 440 megawatts.

According to the details, the water level of the Tarbela dam has reached 1409.52 feet, where eight power generation units are producing electricity 440 megawatts and they are also not working with full capacity either.

The Tarbela dam officials disclosed that owing to decreased water inflow in the dam the capacity of Tarbela power production reduced from 3478 megawatts to only 440 megawatts as only 9 units out of 17 are producing power.

Water inflow in the dam was 16800 cusecs whereas outflow from Tarbela dam was 24000 cusecs feet while the water level of the dam reached 1409.2 feet.

It is expected that the water inflow situation will improve after March when the temperature will rise and snow melting would speed up.

It was also disclosed that today 500 cusecs of water was released for Pehur High-Level Canal (PHLC) to supply water to some areas of KP for irrigation.

Comments

Comments are closed.