BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

KARACHI: Federal government will construct 20 small dams in Balochistan to save the flood water for irrigation and damages caused by flood.

The construction of 20 small dams is part of the plan to construct 100 dams in the province. The construction of 20 dams in Package-III will cost Rs 8.877 billion.

The Package-III envisaged the construction of 20 small to medium dams in Balochistan. The objectives of the project are in consonance with the objectives of the sector which are inter alia, to harness flood flows for direct irrigation, ground water recharge, agriculture development and poverty alleviation through environmentally acceptable and sustainable projects.

Besides the above objectives, the project will also be instrumental in protecting the downstream areas from flashy floods. In addition, the project will also increase the crop yield in existing irrigation areas.

The dams will also provide drinking water to the population and livestock of the adjoining areas. The project will also go a long way in improving the health and socio-economic conditions of the populations in the area. It would also supply about 125.5 million m3 of conserved flood water for direct irrigation and drinking purposes and will benefit about 58,500 acres (23,684 hectares) of fertile land.

Copyright Business Recorder, 2020

Comments

Comments are closed for this article.