AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)

LAHORE: The Orange Line Metro Train under the China-Pakistan Economic Corridor (CPEC) started trial operations under the management of a joint venture (Norinco International Cooperation-Guangzhou Metro Group (GMG)-Daewoo Pakistan Express) led by Norinco International. The preparatory work has entered the final stage with commercial operation expected to start soon.

It is pertinent to mention that in February 2020, Norinco International, as the leading company, joined hands with Guangzhou Metro Group (GMG) and Pakistan Daewoo Company to form a joint venture team which successfully won the contract for the operation and maintenance (O&M) of Orange Line for the next eight years.

After the O&M contract was signed, the joint operation and maintenance team carried out various forms of recruitment and skill trainings. The Chinese mentors imparted professional rail transit knowledge to the local students and both the sides established a deep friendship between the teachers and trainees. So far, the joint team has completed recruitment, skills training, joint survey, and re-test, and is well prepared for the opening.

With the launch of Orange Line, it is estimated that nearly 250,000 passengers will be facilitated with this service every day and the commuting time through the northern and southern urban areas of the city will be significantly reduced from 2.5 hours to 45 minutes.

Copyright Business Recorder, 2020

Comments

Comments are closed.