AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)

KARACHI: Pakistan Railways (PR) is all set to float Rs102 million tenders for multiple works on the rehabilitation of Karachi Circular Railway (KCR) Project, officials said.

They said that some seven major works cited in the tender entailed: removal of debris and solid waste from railway track between Wazir Mansion to Orangi, rehabilitation of station buildings from Karachi City to Orangi, Rehabilitation of bridges, foot-over bridges and platform shelters, supplying, stacking and loading of 2 stone balast at Wazir Mansion, and rehabilitation of level crossing in Group A, B and C, that is, level crossing No. 13, 14, 16, 17, 17-B, 19, 21, 22, 23, 24, 24-A, 28 and 30.

Officials said that in consequence of the directives of Supreme Court pertaining to the revival of KCR, a Rs102 million tender are being floated for carrying out multiple tasks on the KCR track.

The Project Director KCR Ameer Mohammad Daudpota said that the restoration of historic mass transit system for the commuters was no far away as its revival was amongst the top priorities of Pakistan Railways. "All the assigned tasks will be concluded with the cooperation of Sindh government within the stipulated time," remarked the PD KCR.

Copyright Business Recorder, 2020

Comments

Comments are closed.