BR100 Increased By (0.17%)
BR30 Increased By (0.35%)
KSE100 Increased By (0.32%)
KSE30 Increased By (0.18%)
AGHA 7.69 Increased By ▲ 0.06 (0.79%)
BECO 5.59 Increased By ▲ 0.02 (0.36%)
BML 59.99 Increased By ▲ 0.25 (0.42%)
BOP 34.85 Increased By ▲ 0.45 (1.31%)
CNERGY 12.90 Decreased By ▼ -0.21 (-1.6%)
CSIL 6.53 Increased By ▲ 0.12 (1.87%)
FCCL 57.80 Decreased By ▼ -0.26 (-0.45%)
FFL 16.34 Increased By ▲ 0.11 (0.68%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.47 Increased By ▲ 0.04 (0.54%)
KOSM 6.15 Increased By ▲ 0.12 (1.99%)
LOTCHEM 27.75 Increased By ▲ 0.08 (0.29%)
MLCF 102.80 Increased By ▲ 0.05 (0.05%)
NBP 205.90 Increased By ▲ 0.84 (0.41%)
NCPL 60.11 Increased By ▲ 0.48 (0.8%)
NPL 69.01 Increased By ▲ 0.45 (0.66%)
OGDC 319.16 Increased By ▲ 0.24 (0.08%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 43.20 Increased By ▲ 0.10 (0.23%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.35 Increased By ▲ 0.90 (0.39%)
PRL 70.15 Decreased By ▼ -0.65 (-0.92%)
PTC 71.01 Increased By ▲ 0.01 (0.01%)
SSGC 27.64 Increased By ▲ 0.23 (0.84%)
TBL 10.37 Increased By ▲ 0.06 (0.58%)
TELE 8.59 Increased By ▲ 0.06 (0.7%)
TPL 23.23 Increased By ▲ 0.17 (0.74%)
TPLP 15.90 Increased By ▲ 0.14 (0.89%)
TREET 24.91 Increased By ▲ 0.20 (0.81%)
TRG 60.44 Increased By ▲ 0.15 (0.25%)
Pakistan

New Islamabad International Airport to be operational by 2014

Published Updated

imnmnmISLAMABAD: The New Islamabad International Airport, located in Fateh Jang Tehsil of Attock District some 30 km southwest of the Federal Capital, is expected to be completed and operational by 2014.

According to official sources in Civil Aviation Authority (CAA) here, a Chinese company and Frontier Works Organization (WFO) are working round the clock to complete construction of passengers terminals buildings before the deadline.

Talking to APP, an official said the new airport will replace the existing one, Benazir Bhutto International Airport located in Chaklala.

At present, the Benazir Bhutto International Airport is handling 18 airlines, adding, most of the international commercial flights are operated at morning time which cause rush and delays.

He, however, expressed the confidence that the new airport spread over 3,600-acre would not only serve the twin cities of Islamabad and Rawalpindi but also the adjoining provinces of Punjab and Khyber Pakhtunkhwa.

Estimated to cost about $400 million, the new airport facility, which is the first green-field airport in Pakistan, would comprise a contemporary state-of-the-art passenger terminal building, control tower, runway with a provision of a secondary runway, taxiways, apron, cargo complex, and hangar together with all the necessary infrastructure and ancillary facilities.

The new airport would cater to the requirements of latest generation of modern passenger aircraft.

He said the new airport will have a modular design to handle 6.5 million passengers per annum and 80,000 metric tonnes cargo per annum.

Being a new airport, a significant portion of the land has been earmarked for commercial purposes such as duty-free shops, hotel and convention centre, air malls, business centre, food courts, leisure and recreational facilities.

The new airport is envisaged to be a modern landmark structure symbolic to represent twenty-first century Pakistan, as it will be the diplomatic and business gateway to Pakistan through the Capital City of Islamabad.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.