BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.06%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.81 Decreased By ▼ -0.17 (-0.31%)
BOP 33.13 Increased By ▲ 0.15 (0.45%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.14 Increased By ▲ 0.01 (0.19%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.85 Increased By ▲ 0.31 (5.6%)
LOTCHEM 27.10 Decreased By ▼ -2.02 (-6.94%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 197.00 Decreased By ▼ -0.49 (-0.25%)
NCPL 55.78 Increased By ▲ 0.76 (1.38%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.85 Increased By ▲ 1.90 (0.61%)
PACE 10.44 Increased By ▲ 0.23 (2.25%)
PAEL 41.35 Increased By ▲ 0.36 (0.88%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 214.00 Increased By ▲ 1.34 (0.63%)
PRL 54.25 Increased By ▲ 1.71 (3.25%)
PTC 70.00 Increased By ▲ 0.92 (1.33%)
SSGC 25.15 Increased By ▲ 0.05 (0.2%)
TBL 9.65 Increased By ▲ 0.03 (0.31%)
TELE 8.36 Increased By ▲ 0.04 (0.48%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.14 Decreased By ▼ -0.08 (-0.61%)
TREET 21.47 Decreased By ▼ -0.27 (-1.24%)
TRG 59.89 Increased By ▲ 3.00 (5.27%)
Pakistan

Upper, lower Chitral to get power from Golen Gol

CHITRAL: The National Assembly Standing Committee on Power on Friday directed the departments concerned to resolve a
Published Updated

CHITRAL: The National Assembly Standing Committee on Power on Friday directed the departments concerned to resolve all impediments for ensuring distribution of electricity to both lower and upper Chitral before the inauguration of Golen Gol power house.

The committee issued these directives in a meeting held here at WAPDA Colony in Koghuzi with MNA from Chitral Shahzada Iftikharuddin in the chair.

MNAs Sher Akber and Junaid along with heads of the Water and Power Development Authority (WPDA), Pakhtunkhwa Energy Development Organization (PEDO) and project director of the 108MW Golen Gol Hydropower Project attended the meeting.

The meeting decided that PESCO of WAPDA and PEDO of KP government would enter into an agreement to restore and remove any faults in the transmission lines inside Chitral before the inauguration of the Golen Gol project on Jan 10.

Both lower and upper Chitral would be provided electricity from Golen Gol in accordance with their current need, it said.

The meeting also resolved that Chitral would be given 30 megawatts from the Golen Gol powerhouse as promised by the former Prime Minister Nawaz Sharif.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.