BR100 Decreased By (-0.02%)
BR30 Increased By (0.15%)
KSE100 Decreased By (-0.06%)
KSE30 Decreased By (-0.09%)
AGHA 7.37 Decreased By ▼ -0.19 (-2.51%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.78 Decreased By ▼ -0.20 (-0.61%)
CNERGY 10.33 Increased By ▲ 0.23 (2.28%)
CSIL 5.06 Decreased By ▼ -0.07 (-1.36%)
FCCL 52.06 Increased By ▲ 0.81 (1.58%)
FFL 16.25 Increased By ▲ 0.07 (0.43%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.16 Increased By ▲ 0.10 (1.42%)
KOSM 5.94 Increased By ▲ 0.40 (7.22%)
LOTCHEM 26.84 Decreased By ▼ -2.28 (-7.83%)
MLCF 89.50 Increased By ▲ 0.68 (0.77%)
NBP 194.80 Decreased By ▼ -2.69 (-1.36%)
NCPL 55.58 Increased By ▲ 0.56 (1.02%)
NPL 64.75 Decreased By ▼ -0.13 (-0.2%)
OGDC 312.38 Increased By ▲ 0.43 (0.14%)
PACE 10.34 Increased By ▲ 0.13 (1.27%)
PAEL 40.60 Decreased By ▼ -0.39 (-0.95%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.57 Decreased By ▼ -0.09 (-0.04%)
PRL 53.50 Increased By ▲ 0.96 (1.83%)
PTC 68.84 Decreased By ▼ -0.24 (-0.35%)
SSGC 24.84 Decreased By ▼ -0.26 (-1.04%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.34 Increased By ▲ 0.02 (0.24%)
TPL 18.17 Increased By ▲ 0.42 (2.37%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.42 Decreased By ▼ -0.32 (-1.47%)
TRG 59.34 Increased By ▲ 2.45 (4.31%)
Pakistan

China races to complete Karot Hydropower Project ahead of schedule

BEIJING: China is racing to complete the Karot Hydropower Project located on the Jhelum River on the boundary betwee
Published Updated

BEIJING: China is racing to complete the Karot Hydropower Project located on the Jhelum River on the boundary between Punjab province and Azad Kashmir ahead of schedule.

"Construction on the power station is "set to finish nine months ahead of its December 2021 completion date." Hydropower construction involves a considerable range of issues such as relocation of people. The shortened construction period suggested the project has gained understanding, support and trust from local authorities and the people, Global Times reported quoting Bloomberg on Thursday.

In recent years, Pakistan has faced intermittent power outages of up to 18 hours a day. Power shortages coupled with high electricity rates hobbled.

The Karot project's installed capacity is 720 megawatts. Additionally, hydropower is the cheapest source of electricity for Pakistan. The project can tangibly benefit the country's economy, which is why it can gain support from local people.

The hydropower plant has long been seen by some observers as a flagship project of the China Pakistan Economic Corridor (CPEC).

By financing the project, China can gain experience that may help future efforts by China to invest in the region.

According to a report, three major hydropower projects, including the Karot station, have been included in the CPEC. It said that those projects "are being executed at a fast pace in Azad Kashmir to provide cost-effective electricity to people."

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.