BR100 Decreased By (-0.26%)
BR30 Decreased By (-0.16%)
KSE100 Decreased By (-0.23%)
KSE30 Decreased By (-0.23%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.71 Decreased By ▼ -0.27 (-0.49%)
BOP 33.14 Increased By ▲ 0.16 (0.49%)
CNERGY 10.47 Increased By ▲ 0.37 (3.66%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.20 Increased By ▲ 0.95 (1.85%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.20 Increased By ▲ 0.14 (1.98%)
KOSM 5.85 Increased By ▲ 0.31 (5.6%)
LOTCHEM 27.15 Decreased By ▼ -1.97 (-6.77%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 197.00 Decreased By ▼ -0.49 (-0.25%)
NCPL 55.80 Increased By ▲ 0.78 (1.42%)
NPL 65.25 Increased By ▲ 0.37 (0.57%)
OGDC 313.86 Increased By ▲ 1.91 (0.61%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.55 Increased By ▲ 0.56 (1.37%)
PIBTL 16.10 Increased By ▲ 0.14 (0.88%)
PPL 213.77 Increased By ▲ 1.11 (0.52%)
PRL 54.33 Increased By ▲ 1.79 (3.41%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 24.99 Decreased By ▼ -0.11 (-0.44%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.19 Increased By ▲ 0.44 (2.48%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.80 Increased By ▲ 2.91 (5.12%)
Pakistan

PPL drills 1.3 km-long horizontal well for tight gas

KARACHI: Pakistan Petroleum Limited (PPL) has drilled and completed tight gas horizontal well Naushahro Feroz (NF) H
Published Updated

KARACHI: Pakistan Petroleum Limited (PPL) has drilled and completed tight gas horizontal well Naushahro Feroz (NF) Hor-1, an official said here on Thursday.

At total depth of 4,940 metres and 1.3 km horizontal section in Chiltan Formation, NF Hor -1 is one of the deepest and longest horizontal wells in tight gas reservoir drilled in Pakistan.

It is also the country's first well to be completed with ten-stage multi-frack, the PPL official added.

PPL made a tight gas discovery at NF X-1 in 2014. This was followed by extensive in-house geological and geophysical studies to design the optimum horizontal well to appraise the discovery.

"Logging while Drilling" technology with real-time evaluation was used to successfully drill the horizontal section.

Based on preliminary results, the well flowed 1.3 MMscfd gas and 9 bbl/d of condensate at 32/64 choke size from one stage only.

PPL plans to carry out ten-stage multi-frack job on the well, which is expected to significantly increase flow potential.

NF Hor-1 is in Naushahro Feroz Block, Sindh, with PPL as operator holding 90 percent working interest and the remaining 10 percent held by Asia Resources Oil Limited.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.