BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.18%)
KSE30 Decreased By (-0.19%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.16 Increased By ▲ 0.07 (1.38%)
BML 54.55 Decreased By ▼ -0.43 (-0.78%)
BOP 33.11 Increased By ▲ 0.13 (0.39%)
CNERGY 10.41 Increased By ▲ 0.31 (3.07%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.20 Increased By ▲ 0.95 (1.85%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.20 Increased By ▲ 0.14 (1.98%)
KOSM 5.80 Increased By ▲ 0.26 (4.69%)
LOTCHEM 27.14 Decreased By ▼ -1.98 (-6.8%)
MLCF 90.25 Increased By ▲ 1.43 (1.61%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.78 Increased By ▲ 0.76 (1.38%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.88 Increased By ▲ 1.93 (0.62%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.35 Increased By ▲ 0.36 (0.88%)
PIBTL 16.10 Increased By ▲ 0.14 (0.88%)
PPL 213.99 Increased By ▲ 1.33 (0.63%)
PRL 54.20 Increased By ▲ 1.66 (3.16%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.10 No Change ▼ 0.00 (0%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.19 Increased By ▲ 0.44 (2.48%)
TPLP 13.12 Decreased By ▼ -0.10 (-0.76%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.81 Increased By ▲ 2.92 (5.13%)

abid-sher-ali-1024ISLAMABAD: State Minister for Water and Power Abid Sher Ali on Tuesday said Pakistan Muslim League Nawaz (PML-N) government had launched hydel, gas and coal projects to meet energy shortage in the country.

Talking to PTV, he said huge investment was being made in various projects due to peaceful environment in the country.

He said coal reservoirs were available in the country specially in Thar region. He said power plants would be installed in these areas to meet energy demand.

To a question, he said previous governments did not pay attention towards electricity due to which people were facing the problem.

The State Minister said the present government had taken initiatives and launched several power projects to add electricity into national grid system.

He said 525 mega watt electricity would be added in the system by 2018.

To another question, he said zero loadshedding would be observed during 'Sehar' and 'Iftar' timings of Ramazan ul Mubarak.

Abid Sher Ali said electricity was being supplied to industrial sector without any interruption.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.