BR100 Decreased By (-0.26%)
BR30 Decreased By (-0.16%)
KSE100 Decreased By (-0.23%)
KSE30 Decreased By (-0.23%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.71 Decreased By ▼ -0.27 (-0.49%)
BOP 33.14 Increased By ▲ 0.16 (0.49%)
CNERGY 10.47 Increased By ▲ 0.37 (3.66%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.20 Increased By ▲ 0.95 (1.85%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.20 Increased By ▲ 0.14 (1.98%)
KOSM 5.85 Increased By ▲ 0.31 (5.6%)
LOTCHEM 27.15 Decreased By ▼ -1.97 (-6.77%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 197.00 Decreased By ▼ -0.49 (-0.25%)
NCPL 55.80 Increased By ▲ 0.78 (1.42%)
NPL 65.25 Increased By ▲ 0.37 (0.57%)
OGDC 313.86 Increased By ▲ 1.91 (0.61%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.55 Increased By ▲ 0.56 (1.37%)
PIBTL 16.10 Increased By ▲ 0.14 (0.88%)
PPL 213.77 Increased By ▲ 1.11 (0.52%)
PRL 54.33 Increased By ▲ 1.79 (3.41%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 24.99 Decreased By ▼ -0.11 (-0.44%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.19 Increased By ▲ 0.44 (2.48%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.80 Increased By ▲ 2.91 (5.12%)

power-line0LAHORE: The Pakistan Water and Power Development Authority (WAPDA) has awarded two contracts of resettlement works for Dasu Hydropower Project.

Both contracts have been awarded to a Chinese firm Zhongmei Engineering Group after international competitive biddings for the purpose.

The agreements were signed in a ceremony wherein representatives of the WAPDA and Zhongmei Engineering Group signed the contract documents on behalf of their organizations.

The contract namely Dasu-LBRV-11 worth Rs 1.2 billion relates to resettlement of three villages- Khoshe, Logro and Uchar. Likewise, the contract Dasu-LBRV-12 worth Rs 1.016 billion is also about resettlement works of three other villages, including Barseen, Nasirabad and Kaigah/Dhaar.

In addition to land development, terracing and electrification, road networks, water supply & sewerage system and local amenities e.g schools, playgrounds, cattle sheds etc. will be constructed for these villages under the contracts. The completion period of these works under both contracts is one year.

It is pertinent to mention that the WAPDA has been implementing 4,320 MW-Dasu Hydropower Project on River Indus near Dasu town of Kohistan district, in Khyber Pakhtunkhwa. Besides awarding different contracts of infrastructure development, two contracts for main civil works of Dasu Hydropower Project's Stage-I had also been awarded in March this year. The construction works is likely to commence in the month of June.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.