BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

pak-railway-1024ISLAMABAD: Pakistan Railways (PR) has fleet of 448 locomotives out of which 293 are functional and 155 are non-functional.

In a written reply to a question during 3rd sitting of 41st session of National Assembly on Friday, it was told that seventy seven (77) new locomotives had been inducted in the system of Pakistan Railways during the last five years.

The House was informed that 93 DE Locomotives were under maintenance/ heavy repairs presently and would be made completely operational by June, 2018.

This is however an ongoing exercise as the running Locomotives have to be detained for carrying out routine schedules/overhauls.

A total of 62 Chinese locomotives are held up since long requiring heavy repairs; the rehabilitation plan of these locomotives is under consideration subject to a feasibility study to establish that the rehabilitation will be economical, keeping in view the residual life of these locomotives.

The lower House was further informed that punctuality of mail express trains has been improved tremendously. During 2013, it was told that there were total 90 passenger trains operational which increased upto 106 in 2016.

 

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.