BR100 Decreased By (-0.04%)
BR30 Increased By (0.11%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.08%)
AGHA 7.34 Decreased By ▼ -0.22 (-2.91%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.75 Decreased By ▼ -0.23 (-0.7%)
CNERGY 10.33 Increased By ▲ 0.23 (2.28%)
CSIL 5.06 Decreased By ▼ -0.07 (-1.36%)
FCCL 52.00 Increased By ▲ 0.75 (1.46%)
FFL 16.22 Increased By ▲ 0.04 (0.25%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.19 Increased By ▲ 0.13 (1.84%)
KOSM 5.93 Increased By ▲ 0.39 (7.04%)
LOTCHEM 26.85 Decreased By ▼ -2.27 (-7.8%)
MLCF 89.63 Increased By ▲ 0.81 (0.91%)
NBP 195.25 Decreased By ▼ -2.24 (-1.13%)
NCPL 55.58 Increased By ▲ 0.56 (1.02%)
NPL 64.60 Decreased By ▼ -0.28 (-0.43%)
OGDC 312.39 Increased By ▲ 0.44 (0.14%)
PACE 10.34 Increased By ▲ 0.13 (1.27%)
PAEL 40.60 Decreased By ▼ -0.39 (-0.95%)
PIBTL 15.97 Increased By ▲ 0.01 (0.06%)
PPL 212.70 Increased By ▲ 0.04 (0.02%)
PRL 53.43 Increased By ▲ 0.89 (1.69%)
PTC 68.59 Decreased By ▼ -0.49 (-0.71%)
SSGC 24.84 Decreased By ▼ -0.26 (-1.04%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.34 Increased By ▲ 0.02 (0.24%)
TPL 18.17 Increased By ▲ 0.42 (2.37%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.42 Decreased By ▼ -0.32 (-1.47%)
TRG 59.34 Increased By ▲ 2.45 (4.31%)
Pakistan

Construction work on hydel power station in progress

ISLAMABAD: Work on the construction of a hydel power station at Mataltan, Swat is in progress. Official sources said
Published Updated

power-line0ISLAMABAD: Work on the construction of a hydel power station at Mataltan, Swat is in progress.

Official sources said that an Italian company is constructing the powerhouse, reported Radio Pakistan.

It will be completed at cost of more than rupees twenty billion by the end of 2020.

The power station on completion will generate eighty-four megawatt electricity.

 

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.