BR100 Decreased By (-0.38%)
BR30 Decreased By (-0.46%)
KSE100 Decreased By (-0.19%)
KSE30 Decreased By (-0.26%)
AGHA 7.45 Decreased By ▼ -0.11 (-1.46%)
BECO 5.09 No Change ▼ 0.00 (0%)
BML 55.56 Increased By ▲ 0.58 (1.05%)
BOP 32.75 Decreased By ▼ -0.23 (-0.7%)
CNERGY 10.31 Increased By ▲ 0.21 (2.08%)
CSIL 5.34 Increased By ▲ 0.21 (4.09%)
FCCL 51.90 Increased By ▲ 0.65 (1.27%)
FFL 16.49 Increased By ▲ 0.31 (1.92%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.15 Increased By ▲ 0.09 (1.27%)
KOSM 6.07 Increased By ▲ 0.53 (9.57%)
LOTCHEM 26.79 Decreased By ▼ -2.33 (-8%)
MLCF 87.95 Decreased By ▼ -0.87 (-0.98%)
NBP 193.40 Decreased By ▼ -4.09 (-2.07%)
NCPL 55.23 Increased By ▲ 0.21 (0.38%)
NPL 64.85 Decreased By ▼ -0.03 (-0.05%)
OGDC 310.60 Decreased By ▼ -1.35 (-0.43%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 40.88 Decreased By ▼ -0.11 (-0.27%)
PIBTL 15.83 Decreased By ▼ -0.13 (-0.81%)
PPL 211.34 Decreased By ▼ -1.32 (-0.62%)
PRL 52.85 Increased By ▲ 0.31 (0.59%)
PTC 68.10 Decreased By ▼ -0.98 (-1.42%)
SSGC 24.84 Decreased By ▼ -0.26 (-1.04%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.30 Decreased By ▼ -0.02 (-0.24%)
TPL 18.30 Increased By ▲ 0.55 (3.1%)
TPLP 12.95 Decreased By ▼ -0.27 (-2.04%)
TREET 21.50 Decreased By ▼ -0.24 (-1.1%)
TRG 59.01 Increased By ▲ 2.12 (3.73%)

imageISLAMABAD: The drilling and construction work has started in second largest point block-I of Thar Coal area under the China Pakistan Economic Corridor.

Radio Pakistan quoting official source said that Four billion ton coal exist in 150 Kilometer long Block.

The cost of the block-1 project is two hundred billion rupees.

He said during the digging two power plants with capacity of 132 megawatt have also been developed.

The construction work in Block-II is also underway with full swing at the cost of two hundred twenty billion rupees.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed for this article.