AIRLINK 75.50 Increased By ▲ 0.65 (0.87%)
BOP 5.00 Increased By ▲ 0.02 (0.4%)
CNERGY 4.52 Increased By ▲ 0.03 (0.67%)
DFML 41.99 Increased By ▲ 1.99 (4.98%)
DGKC 87.11 Increased By ▲ 0.76 (0.88%)
FCCL 21.55 Increased By ▲ 0.19 (0.89%)
FFBL 34.00 Increased By ▲ 0.15 (0.44%)
FFL 9.83 Increased By ▲ 0.11 (1.13%)
GGL 10.55 Increased By ▲ 0.10 (0.96%)
HBL 114.31 Increased By ▲ 1.57 (1.39%)
HUBC 138.60 Increased By ▲ 1.16 (0.84%)
HUMNL 12.04 Increased By ▲ 0.62 (5.43%)
KEL 5.18 Decreased By ▼ -0.10 (-1.89%)
KOSM 4.71 Increased By ▲ 0.08 (1.73%)
MLCF 38.02 Increased By ▲ 0.22 (0.58%)
OGDC 140.02 Increased By ▲ 0.52 (0.37%)
PAEL 26.27 Increased By ▲ 0.66 (2.58%)
PIAA 21.90 Increased By ▲ 1.22 (5.9%)
PIBTL 6.87 Increased By ▲ 0.07 (1.03%)
PPL 124.30 Increased By ▲ 2.10 (1.72%)
PRL 27.01 Increased By ▲ 0.43 (1.62%)
PTC 14.05 No Change ▼ 0.00 (0%)
SEARL 59.28 Increased By ▲ 0.30 (0.51%)
SNGP 68.80 Decreased By ▼ -0.15 (-0.22%)
SSGC 10.40 Increased By ▲ 0.10 (0.97%)
TELE 8.44 Increased By ▲ 0.06 (0.72%)
TPLP 11.28 Increased By ▲ 0.22 (1.99%)
TRG 64.40 Increased By ▲ 0.21 (0.33%)
UNITY 26.62 Increased By ▲ 0.07 (0.26%)
WTL 1.49 Increased By ▲ 0.04 (2.76%)
BR100 7,916 Increased By 78.6 (1%)
BR30 25,709 Increased By 257.4 (1.01%)
KSE100 75,700 Increased By 585.7 (0.78%)
KSE30 24,310 Increased By 195.9 (0.81%)

imageISLAMABAD: The government has released Rs.42,207.624 million out of total Rs.51543.425 million allocated under the Public Sector Development Program (PSDP) for 2013-14 for various power projects so far.

According to Planning Commission data, an amount of Rs.27,500 million was released for construction of Diamer Basha Dam Project Land Acquisition, Rs.14,000 million for Neelum Jhelum Hydropower Project and Rs.135 million for 132KV Sub Stations at Deep Sea Port Gwadar.

Similarly, a sum of Rs.100 million each was also released for 132 KV T/Line Balozai Balochistan and Study for Master Plan of 6600 MW Pakistan Power Park at Gaddani, Rs.53 million for construction of 132 KV Grid Station at Dera Bughti, Rs.94.424 million for construction of 132 KV Grid Station at Mall, Rs.50 million for construction of 132 Sui Grid Station and Kashmore-Sui Transmission line and Rs.64 million for electrification of village Dera Bughti.

Comments

Comments are closed.