BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
Pakistan

Power breakdown causes 500mg water shortfall

Published August 5, 2012 Updated August 5, 2012 03:35pm

water 1KARACHI: Electricity outage at Gharo, Pipri and Dhabeji pumping stations did not only caused 500 million gallon shortfall in the water supply it also caused heavy damage to Karachi Water and Sewerage Board's supply and sewerage pumps as well as other equipment.

These pumping stations are responsible for major supply to Karachi providing 550 million gallon daily, which is pumped, from Dhabeji to Karachi via Gharo and Pipri station, a statement issued by Karachi Water and Sewerage Board (KWSB) said here Sunday.

Due to fluctuation in the pressure, a 72-inch diameter water line burst around 5:00 am in the morning whereas, two pumps were severely damaged in the process. After the disruption in supply from Dhabeji, citizens of Karachi were relying on Hub pumping station for water supply however, another outage caused by technical fault in K.E.S.C lines completely disconnected the water supply to the metropolis.

Managing Director KW&SB Misbauddin Farid taking immediate notice of the situation surveyed the situation at Dhabeji, Gharo and Pipri, where the supply was resumed under his supervision at about 9:00 pm.

The supply was disrupted once again when a string of technical faults in K.E.$.C's system erupted not only severely damaging Water board pumps and other equipment but also causing a 72-inch diameter line to burst due to fluctuated pressure. Electric supply to hub pumping station was disrupted simultaneously.

Chief Engineer Zaheer Abbas went to Dhabeji with his team as soon as the line burst to start the repair. Water supply was resumed at 9:00 am on Sunday morning under supervision of C.E Zaheer Abbas.

The electricity outage and disruption in the supply did not only damage the water supply equipment. It also damaged the sewerage systems especially in the old city area and sewerage lines in the south region, where seweraglines leaked at several spots. Moreover, sewerage equipment at Jameela Pumping Station Ranchor Line, Lee Market pumping station, Chakewara pumping station and Clifton Pumping Station is gravely damaged.

The MD KW&SB is personally supervising the repair of maintenance of the equipment.

KW&SB has also appealed to the citizens to use water carefully.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed for this article.