BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)
Markets

Germany set to have at least 2 LNG terminals -minister

Published Updated

BERLIN: German Economy Minister Peter Altmaier said on Tuesday he was optimistic that Germany would build two terminals in the foreseeable future to import liquefied natural gas (LNG).

As Germany phases out nuclear power and coal, it is increasingly turning to gas to compliment renewable energy sources. It is under pressure, especially from the United States, to cut its dependence on Russian gas and buy in LNG.

Altmaier told a meeting with German and U.S. energy officials and industry lobbyists that Germany was weighing up the extent of state subsidies and regulations before private investors build the terminals needed for LNG imports.

Of three sites under consideration - Brunsbuettel, Stade and Wilhelmshaven - Altmaier was confident terminals would be built at two in the foreseeable future.

"All three projects are (being) carefully considered and examined," he said. "I am quite optimistic that at least two of the terminals will be realised within a very foreseeable period of time."

Altmaier made clear that the question of LNG was a separate issue to Nord Stream 2 pipeline, backed by Germany, which will bring Russian gas to Europe under the Baltic Sea, bypassing Ukrainian pipelines.

Ukraine is concerned that the 1,225 km (760 mile) pipeline will lead to a dramatic loss in transport revenues but Germany is trying to reassure Kiev that gas will still be transported from Russia through Ukraine's existing pipeline.

"The intention is to come as soon as possible ... to a new agreement between Russia and Ukraine," he said.

Copyright Reuters, 2019

Comments

Comments are closed for this article.