BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

KARACHI: Expressing a grave concern over inordinate delay in the crucial Hyderabad-Sukkur Motorway project, Pasban Democratic Party (PDP) Chairman Altaf Shakoor said it is causing a great harm to the economy of Sindh, as well as, the whole country.

He said modern motorways have already been built in other areas of the country, even in the difficult hilly terrains but the people of Sindh are still being deprived of this facility.

He said the old Superhighway is designated as M-9 Motorway, but it is not a ‘motorway’ in a true sense, and hence, the whole Sindh doesn’t have a single modern motorway, which shows the mindset of the rulers towards this province.

He said the proposed motorway, widely referred to as the M-6, if ever built could redefine connectivity, trade, and economic growth across Sindh and beyond.

Stretching approximately 306 kilometres between Sukkur and Hyderabad — and ultimately linking to Karachi — the motorway is designed to complete a high-speed corridor from the megacity to northern Pakistan.

He said if ever built this motorway will seamlessly connect with the existing motorway network leading upcountry, significantly reducing travel time and transport costs. He said Karachi, Pakistan’s largest city and economic hub, handles the bulk of the country’s imports and exports through its ports. However, heavy reliance on the National Highway (N-5) has long resulted in congestion, accidents, and delays.

He said the new motorway will provide faster cargo movement between ports and industrial zones, reduce fuel consumption and logistics costs, ensure safer travel conditions compared to the overburdened N-5. It will improve supply chain reliability for businesses.

Copyright Business Recorder, 2026

Comments

200 characters remaining