BR100 Increased By (0.12%)
BR30 Increased By (0.28%)
KSE100 Increased By (0.26%)
KSE30 Increased By (0.26%)
AGHA 7.63 Increased By ▲ 0.04 (0.53%)
BECO 5.57 Increased By ▲ 0.06 (1.09%)
BML 59.74 Increased By ▲ 0.66 (1.12%)
BOP 34.40 Increased By ▲ 0.29 (0.85%)
CNERGY 13.11 Increased By ▲ 0.27 (2.1%)
CSIL 6.41 Increased By ▲ 0.31 (5.08%)
FCCL 58.06 Increased By ▲ 0.40 (0.69%)
FFL 16.23 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.43 Decreased By ▼ -0.05 (-0.67%)
KOSM 6.03 Increased By ▲ 0.09 (1.52%)
LOTCHEM 27.67 Decreased By ▼ -0.32 (-1.14%)
MLCF 102.75 Increased By ▲ 2.10 (2.09%)
NBP 205.06 Increased By ▲ 1.31 (0.64%)
NCPL 59.63 Decreased By ▼ -0.94 (-1.55%)
NPL 68.56 Decreased By ▼ -1.40 (-2%)
OGDC 318.92 Decreased By ▼ -1.37 (-0.43%)
PACE 11.05 Decreased By ▼ -0.05 (-0.45%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.63 Increased By ▲ 0.07 (0.42%)
PPL 229.45 Increased By ▲ 0.61 (0.27%)
PRL 70.80 Decreased By ▼ -0.22 (-0.31%)
PTC 71.00 Decreased By ▼ -0.65 (-0.91%)
SSGC 27.41 Increased By ▲ 0.73 (2.74%)
TBL 10.31 Increased By ▲ 0.50 (5.1%)
TELE 8.53 Decreased By ▼ -0.08 (-0.93%)
TPL 23.06 Increased By ▲ 0.82 (3.69%)
TPLP 15.76 Increased By ▲ 0.65 (4.3%)
TREET 24.71 Increased By ▲ 0.58 (2.4%)
TRG 60.29 Increased By ▲ 0.45 (0.75%)

LAHORE: The National Grid Company of Pakistan Ltd (NGC) has successfully energized the 500 kV K2/K3–Matiari and KKI–Port Qasim transmission line circuits, marking a major step forward in strengthening the nation’s power infrastructure. This 102 km long transmission line (double-circuit, quad-bundle) is intended to evacuate 2,200 MW power from K2 and K3 nuclear power plants near Karachi.

The newly commissioned transmission line establishes a dedicated link between the K2/K3 facilities of KANUUP (PAEC) with the existing 500kV Port Qasim- Matiari transmission line and has been completed at an approximate cost of PKR 18.45 billion. This critical enhancement in the transmission infrastructure significantly augments the reliability, stability, and transmission capacity of the national grid.

The energization of the transmission line will witness an increase in NGC’s grid resilience in the southern region, catalyzing regional development and creating job opportunities while contributing to a broader economic growth. The project will also support Pakistan’s energy security vision by ensuring induction of clean nuclear energy into the energy mix.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.