BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
By

SUKKUR: Chief Engineer, Irrigation, Guddu Barrage Sukkur, has announced that all canals originating from Guddu Barrage will undergo a mandatory 30-day closure for annual maintenance and infrastructure repairs.

According to the notification, issued here on Saturday, the shutdown will take effect from 12:00 midnight on March 31 to April 1, 2025, and continue until 12:00 midnight on April 30 to May 1, 2025, impacting water supply to agricultural zones dependent on the barrage’s network.

During this period, routine inspections, maintenance work, and critical repairs will be carried out to ensure the long-term efficiency and safety of the irrigation system.

The Ghotki Feeder, Begari Sindh Feeder, Desert Pat Feeder, and Rainee Canal key channels supplying water to farmlands across the region will experience a complete suspension of water flow.

Guddu Barrage Authorities confirmed that the barrage’s gates will be gradually raised starting midnight on March 31, 2025, to halt water release into the canals. Normal operations will resume by midnight on April 30, 2025, when the gates are lowered back into position.

Farmers and agricultural communities relying on these canals have been advised to adjust their irrigation schedules and water usage to minimize disruptions to crops and livestock.

The annual closure is a standard procedure aimed at addressing wear and tear, reinforcing infrastructure, and optimizing water distribution ahead of the upcoming agricultural season.

Comments

Comments are closed for this article.