AIRLINK 74.25 Decreased By ▼ -0.35 (-0.47%)
BOP 5.05 Decreased By ▼ -0.09 (-1.75%)
CNERGY 4.42 Decreased By ▼ -0.08 (-1.78%)
DFML 35.84 Increased By ▲ 2.84 (8.61%)
DGKC 88.00 Decreased By ▼ -0.90 (-1.01%)
FCCL 22.20 Decreased By ▼ -0.35 (-1.55%)
FFBL 32.72 Increased By ▲ 0.02 (0.06%)
FFL 9.79 Decreased By ▼ -0.05 (-0.51%)
GGL 10.80 Decreased By ▼ -0.08 (-0.74%)
HBL 115.90 Increased By ▲ 0.59 (0.51%)
HUBC 135.84 Decreased By ▼ -0.79 (-0.58%)
HUMNL 9.84 Decreased By ▼ -0.13 (-1.3%)
KEL 4.61 Decreased By ▼ -0.02 (-0.43%)
KOSM 4.66 Decreased By ▼ -0.04 (-0.85%)
MLCF 39.88 Increased By ▲ 0.18 (0.45%)
OGDC 137.90 Decreased By ▼ -1.06 (-0.76%)
PAEL 26.43 Decreased By ▼ -0.46 (-1.71%)
PIAA 26.28 Increased By ▲ 1.13 (4.49%)
PIBTL 6.76 Decreased By ▼ -0.08 (-1.17%)
PPL 122.90 Increased By ▲ 0.16 (0.13%)
PRL 26.69 Decreased By ▼ -0.32 (-1.18%)
PTC 14.00 No Change ▼ 0.00 (0%)
SEARL 58.70 Decreased By ▼ -0.77 (-1.29%)
SNGP 70.40 Decreased By ▼ -0.75 (-1.05%)
SSGC 10.36 Decreased By ▼ -0.08 (-0.77%)
TELE 8.56 Decreased By ▼ -0.09 (-1.04%)
TPLP 11.38 Decreased By ▼ -0.13 (-1.13%)
TRG 64.23 Decreased By ▼ -0.90 (-1.38%)
UNITY 26.05 Increased By ▲ 0.25 (0.97%)
WTL 1.38 Decreased By ▼ -0.03 (-2.13%)
BR100 7,838 Increased By 19.2 (0.24%)
BR30 25,460 Decreased By -117.2 (-0.46%)
KSE100 74,931 Increased By 266.7 (0.36%)
KSE30 24,146 Increased By 74.2 (0.31%)

HUB: The recent rains have resulted in the filling of the Hub Dam, a development that brings hope to the citizens of Karachi.

The dam is now expected to provide 100 million gallons of water per day to the residents of Karachi for a duration of three years.

Abdur Rahman, the Project Director of Hub Dam, expressed optimism about the potential water supply. He mentioned that the dam has the capacity to deliver 160 million gallons of water to both Karachi and Balochistan.

Highlighting another crucial aspect, Abdur Rahman stressed that ensuring the proper repair of the Hub Canal and putting security measures would be instrumental in enabling Karachi to receive its full water quota.

The filling of the Hub Dam comes as a significant relief for the water-scarce city of Karachi, and the increased water supply is expected to alleviate the ongoing water shortage in the region.

The Hub Dam, constructed in 1981 on the arid plains north of Karachi, serves as a critical water supply source for irrigation in Lasbella District and provides domestic and drinking water to the city of Karachi.

At its current capacity, the dam can supply the city with up to 100 million gallons of water per day. However, the actual supply is restricted to fifty million gallons per day due to the dilapidated condition of the Hub Canal, which limits its full potential.

Comments

Comments are closed.

Maqbool Jul 29, 2023 03:36pm
Even with an extra 160 million gallons , the water mafia of DHA Karachi rules, keeps their residents waterless .
thumb_up Recommended (0)