BR100 Increased By (0.73%)
BR30 Increased By (0.48%)
KSE100 Increased By (0.56%)
KSE30 Increased By (0.56%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.20 Increased By ▲ 0.01 (0.19%)
BML 57.51 Decreased By ▼ -1.15 (-1.96%)
BOP 34.18 Increased By ▲ 0.49 (1.45%)
CNERGY 10.62 Increased By ▲ 0.01 (0.09%)
CSIL 5.43 Increased By ▲ 0.13 (2.45%)
FCCL 54.90 Increased By ▲ 1.16 (2.16%)
FFL 16.67 Increased By ▲ 0.21 (1.28%)
FNEL 1.25 Increased By ▲ 0.03 (2.46%)
KEL 7.43 Increased By ▲ 0.15 (2.06%)
KOSM 5.82 Increased By ▲ 0.18 (3.19%)
LOTCHEM 29.70 Increased By ▲ 0.05 (0.17%)
MLCF 95.48 Decreased By ▼ -0.88 (-0.91%)
NBP 203.90 Increased By ▲ 0.37 (0.18%)
NCPL 57.99 Increased By ▲ 1.14 (2.01%)
NPL 69.25 Increased By ▲ 1.94 (2.88%)
OGDC 317.48 Decreased By ▼ -0.74 (-0.23%)
PACE 10.74 Increased By ▲ 0.11 (1.03%)
PAEL 42.92 Increased By ▲ 1.15 (2.75%)
PIBTL 16.80 Decreased By ▼ -0.01 (-0.06%)
PPL 220.43 Increased By ▲ 0.26 (0.12%)
PRL 51.00 Increased By ▲ 1.95 (3.98%)
PTC 70.72 Increased By ▲ 0.71 (1.01%)
SSGC 28.56 Decreased By ▼ -0.58 (-1.99%)
TBL 9.87 Increased By ▲ 0.10 (1.02%)
TELE 8.89 Increased By ▲ 0.07 (0.79%)
TPL 18.40 Increased By ▲ 1.23 (7.16%)
TPLP 13.02 Increased By ▲ 0.51 (4.08%)
TREET 22.70 Increased By ▲ 0.11 (0.49%)
TRG 59.92 Decreased By ▼ -0.30 (-0.5%)

KARACHI: Chief Executive Officer (CEO) Karachi Water and Sewerage Board (KW&SB) Engineer Syed Salahuddin Ahmed has said that the board with other departments of the Sindh Government including the health department is engaged to fight the Naegleria virus.

He said that KW&SB is working day and night to prevent Naegleria, while the required dosing of Chlorine is being added to the water supplied to the citizens according to the standard and quantity set by the World Health Organization.

He said in a statement that the KW&SB is adding chlorination to the water through its nine filter plants located at six different locations. In this regard, regular chlorine is being added from Gharo Filter Plant, including COD Filter Plant, Hub Filter Plant, NEK old, NEK II, and Pipri Filter Plant. He said all the filter plants are working round the clock for Chlorination, while the KW&SB uses about 240 Chlorine cylinders per month as required.

He said the KW&SB adds Chlorine to the water in two stages, In the first stage, Pre Filtration Chlorination is added at about 1.0 Ppm, while in the second stage, Post Filtration Chlorination is added at 2.0 Ppm. Apart from this, the Lab Unit Staff KW&SB is checking the dosing of chlorine in the water in different areas of the megacity.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.