BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)
Pakistan Print edition: 2022-12-12

Lodhran-Shahdara section: Railways to replace old, obsolete signal gear

ISLAMABAD: Pakistan Railways has worked out a plan to replace old and obsolete signal gear from...
Published Updated
By

ISLAMABAD: Pakistan Railways has worked out a plan to replace old and obsolete signal gear from Lodhran-Multan-Khanewal-Shahdara Bagh mainline section during the current fiscal year.

According to an official, Pakistan Railways had allocated Rs 1 billion for the project titled ‘Replacement of old and obsolete signal gear from Lodhran-Multan-Khanewal- Shahdara Bagh mainline section.’ He told APP on the other day that the signaling system of 44 stations was automated by Computer Based Interlocking (CBI) over Shandadpur-Mirpur Mathelo and Lodhran-Shahdara Bagh section.

The initiative, he said, had considerably improved the arrival and departure timing of trains owing to swift operation in the automated section. The engineering restrictions on tracks were being removed to curtail the running time of passenger trains. “Pakistan Railways is rigorously pursuing Main Line-I project under the China-Pakistan Economic Corridor (CPEC) to upgrade its track which faced delay during the last four years,” he said.

He said Rs 5 billion were already allocated for the ML-I project in current fiscal year 2022-23. The project would increase trains speed from 120 to 160 km per hour, he added. The official said the journey time would be reduced by half after the implementation of the project.

He said that the Pakistan Railways had procured 230 new passenger coaches from China and the modern coaches would provide comfortable journey to the passengers as per international standards.

Comments

Comments are closed for this article.