BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)

LAHORE: Gulpur Hydropower Project has formally been inaugurated by Advisor to Prime Minister on Kashmir Affairs and Gilgit-Baltistan. Now, the Gulpur Hydropower Project is providing clean and cheap energy to the National Grid, stated by Managing Director Dr Tahir Masood in a press communique on Monday. NESPAK along with MWH, USA has provided consultancy services as owner’s engineer on this project.

The project is sponsored by a consortium of South Korean companies led by Korea South-East Power Company who will operate the project for a period of 30 years.

The plant is run-of-the-river hydroelectric generation facility located on the Poonch River near Gulpur village in Kotli Azad Jammu and Kashmir.

The Poonch River is one of the major tributaries of Jhelum River and confluences in Mangla Dam Reservoir after 28KM. The site is about 167 km from Islamabad and can be accessed in all the seasons.

The Project was financed by Multilateral Development Banks comprising International Finance Corporation, Asian Development Bank, Export-Import Bank of Korea and FMO Netherlands. Furthermore, the Project was supervised by NESPAK & MWH (USA) as owner engineer and Mott Macdonald (UK) served as Lender’s technical advisor for best quality of construction.

The project is constructed by South Korean premier construction companies led by DL ENC Ltd (formerly Daelim Industrial Co Ltd) within the given timeframe despite facing challenges of flood in Poonch River, highly security sensitive area and difficult accessible project site etc. The Project designed for an installed capacity of 102 MW.

The project (started in 2015) was the first of its kind, which was developed in the national park having critically endangered species. The plant has been generating electricity since February 2020 and providing clean and sustainable energy to the national grid with top-tier customized equipment.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.