BR100 Increased By (2.94%)
BR30 Increased By (3.47%)
KSE100 Increased By (2.69%)
KSE30 Increased By (2.84%)
BECO 5.62 Increased By ▲ 0.04 (0.72%)
BML 59.51 Decreased By ▼ -1.71 (-2.79%)
BOP 34.61 Increased By ▲ 0.93 (2.76%)
CNERGY 8.08 No Change ▼ 0.00 (0%)
DCL 12.05 Increased By ▲ 0.41 (3.52%)
FCCL 54.40 Increased By ▲ 2.26 (4.33%)
FCSC 5.52 Decreased By ▼ -0.11 (-1.95%)
FFL 18.05 Increased By ▲ 0.04 (0.22%)
FNEL 1.33 Decreased By ▼ -0.02 (-1.48%)
HUMNL 11.07 Increased By ▲ 0.03 (0.27%)
KEL 8.05 Increased By ▲ 0.21 (2.68%)
KOSM 5.88 Increased By ▲ 0.15 (2.62%)
MLCF 90.52 Increased By ▲ 4.01 (4.64%)
NBP 190.17 Increased By ▲ 5.87 (3.19%)
PACE 11.53 Decreased By ▼ -0.12 (-1.03%)
PAEL 41.07 Increased By ▲ 1.11 (2.78%)
PIAHCLA 25.84 Increased By ▲ 0.17 (0.66%)
PIBTL 17.51 Increased By ▲ 0.24 (1.39%)
PPL 225.84 Increased By ▲ 3.17 (1.42%)
PRL 34.63 Increased By ▲ 0.17 (0.49%)
PTC 64.62 Increased By ▲ 0.88 (1.38%)
SEARL 91.38 Increased By ▲ 0.92 (1.02%)
SSGC 26.97 Increased By ▲ 0.30 (1.12%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 69.16 Increased By ▲ 0.69 (1.01%)
TPLP 10.90 Decreased By ▼ -0.30 (-2.68%)
TREET 24.64 Decreased By ▼ -0.06 (-0.24%)
TRG 69.78 Decreased By ▼ -0.81 (-1.15%)
WAVES 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.27 No Change ▼ 0.00 (0%)

KARACHI: Karachi Water and Sewerage Board (KW&SB) Friday decided to cut off water and sewerage connections of consumers defaulting payments, with immediate effect.

A high-level meeting of RRG department was held in Managing Director (MD) KW&SB Secretariat at Karsaz under the chairmanship of MD Rafiq Qureshi.

Addressing the officers during the meeting, the MD directed that immediate action be taken against the defaulting consumers including the government, non-government, commercial and residential consumers, and their lines should be disconnected with immediate effect and notices should be served to them.

“A grand operation against the defaulting government, non-government, commercial and residential slums should be conducted and their water and sewerage connections should be cut off immediately,” the MD said.

In this regard, the MD Water Board issued orders to the concerned Superintendent Engineers and Executive Engineers and asked them to cooperate fully with the officers of the RRG Department.

MD Water Board said that all employees of the Water Board should improve their performance so that the recovery of the Water Board can be improved.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.